Similar Projects
Foster Street Multi-Residential Development
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Mitchell, SD 57301

Foster Street Multi-Residential Development
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Mitchell, SD 57301

Corn Palace Renovation
Renovation, Infrastructure
Design
$42,000,000 CJ est. value
Mitchell, SD 57301

West Fifth Avenue and West Ninth Avenue Improvement - City of Mitchell
Infrastructure
Design
$1,000,000 CJ est. value
Mitchell, SD 57301

Firesteel Creek Wetlands
Infrastructure
Bidding
$300,000 CJ est. value
Mitchell, SD 57301

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Site demo and track/field relocation
Infrastructure
Post-Bid
$500,000 CJ est. value
Mitchell, SD 57301

Foster Street Bridge Preservation
Renovation, Infrastructure
Results
Mitchell, SD 57301

Asphalt Surface Treatment
Infrastructure
Results

New Mitchell High School
New Construction, Infrastructure
Construction
$30,000,000 CJ est. value
Mitchell, SD 57301

Lake Mitchell Dredging - City of Mitchell
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Mitchell, SD 57301

Sharpstone Subdivision Multi Family Dwelling Units
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Mitchell, SD 57301

Main Street Streetscape - City of Mitchell
Infrastructure
Conception
$2,600,000 CJ est. value
Mitchell, SD 57301

Mill, AC Resurfacing, Pipe Work
Infrastructure
Design
$10,341,000 CJ est. value
Ethan, SD 57334

Paving and Overlay Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Mount Vernon, SD 57363

Last Updated 07/07/2023 03:34 PM
Project Title

Mitchell High Plains Processing Plant

Physical Address View project details and contacts
City, State (County) Mitchell, SD 57301   (Davison County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $500,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 7, 2023, Planning an zoning approved the Tax Increment Financing district (TIF). In 2022 the project received conditional permit approval from the Davidson County Commission. Project is still in the planning process. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents