Similar Projects
Last Updated | 10/23/2020 09:55 AM |
Project Title | Runway 1-19 Rehabiliation Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | New Castle, DE 19720 (New Castle County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Runways/Taxiways |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Base Bid portion of this project generally consists of the rehabilitation of Runway 1-19 to the North of Taxiway D / Taxiway B4, including the Runway 1-19 / Runway 9-27 Intersection. The Base Bid portion of this project generally includes mill and overlay, joint/crack sealing, full-depth asphalt concrete (“AC”) repair, turf grading, replacement of electrical cable, lights, and signage, and pavement marking. There is also work included for the connector taxiways, including electrical work to the South of the Base Bid pavement rehabilitation limits. Additive Alternate No. 1 generally includes the additional areas of Taxiway D, Taxiway B4, and Runway 1-19 between Taxiway D and Taxiway B4. Additive Alternate No. 2 generally includes the additional area from the pavement rehabilitation limits of Additive Alternate No. 1 to an area located approximately behind the Runway 14-32 threshold. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |