Similar Projects
2021 Ski Ranches Waterline Improvements
Post-Bid
Mountain Village, CO

Water Meter Replacement and Relocation Project
Infrastructure
Post-Bid
Rico, CO

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Lower Edgewood Water Line
Infrastructure
Post-Bid
Snowmass Village, CO

North 3rd Avenue Waterline Replacement
Results
Less than $465,000 est. value
Sterling, CO 80751

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Daisy Circle Waterline Replacement
Results
Mount Crested Butte, CO 81224

Site Prep and Utility Hook Up for A 3 Room Double Wide Modular
Infrastructure
Post-Bid
CO

Water District Phase 1H- Part 2 Water Distribution Project
Results
$1,000,000 to $1,500,000 est. value
Ignacio, CO 81137

CR Water Projects
Infrastructure
Post-Bid
Castle Rock, CO

Platteville Boulevard Waterline
Results
Pueblo, CO 81007

Canyons Tank and Pipeline Project
Infrastructure
Post-Bid
$3,500,000 est. value
Castle Rock, CO 80108

2020 Salida Hot Springs Aquatics Center Effluent Flow Metering Upgrades
Results
Salida, CO 81201

Horse Ranch Water Line
Infrastructure
Post-Bid
$150,000 est. value
Snowmass Village, CO 81615

Last Updated 05/20/2022 12:49 PM
Project Title

Lake Irwin Valve and Piping Project

Physical Address View project details and contacts
City, State (County) Crested Butte, CO 81224   (Gunnison County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Lake Irwin improvements to replace aging dam outfall piping and valving including the existing intake structure, intake timber set tunnel, valve shaft, and outfall pipeline. The Town is currently considering two options for improvements, including complete replacement of all facilities and partial replacement leaving a portion of existing infrastructure in-place. The final system configuration will be selected as part final design.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents