Similar Projects
1120 & 1130 N State
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$50,000,000 CJ est. value
Chicago, IL 60610

Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

DMDF Vertical Expansion Project Front Ends
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Chicago, IL 60604

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

McCook and Thornton Reservoirs Rock Wall Stabilization and Geotechnical Instrumentation
Renovation
Results
$8,460,000 to $10,250,000 est. value
Bedford Park, IL 60501

Lake Street Office
New Construction, Infrastructure - 67,600 SF
Construction
$16,600,000 CJ est. value
Chicago, IL 60607

St. Alexius Medical Center Addition
Addition, Infrastructure, Renovation - 29,000 SF
Construction
$14,000,000 CJ est. value
Hoffman Estates, IL 60169

Dialysis Care Center Western
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Chicago, IL 60620

Halsted Street Mixed-Use Development
New Construction, Infrastructure - 4,000 SF
Pending Verification
$2,000,000 CJ est. value
Chicago, IL 60614

London Crossing
New Construction, Infrastructure - 32,600 SF
Design
$11,000,000 CJ est. value
Wheeling, IL 60090

1300 Carroll - Phase 1
LEED Certification, New Construction, Infrastructure - 787,807 SF
Post-Bid
$155,000,000 CJ est. value
Chicago, IL 60607

Northwest Wheeling CNG Bus Maintenance & Storage Facility
New Construction
Results
$40,000,000 est. value
Wheeling, IL 60090

210 N Aberdeen Mixed-Use
New Construction, Infrastructure - 10,700 SF
Construction
$140,000,000 CJ est. value
Chicago, IL 60607

North Rush Street Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,900,000 CJ est. value
Chicago, IL 60611

Last Updated 06/20/2023 10:17 AM
Project Title

Western Pressure Zone Booster Pump Station

Physical Address View project details and contacts
City, State (County) Tinley Park, IL 60487   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,436,250 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

General The Work to be performed generally consists of furnishing labor, materials, equipment, and supervision as required by the Contract Documents for furnishing, installing, testing and placing into operation the Western Pressure Zone Booster Pump Station including related accessory equipment LOCATION OF THE WORK The Western Pressure Zone Booster Pump Station work site is located just west of the intersection of 179th Street and Golden Pheasant Drive in Tinley Park, IL. Parking will be available on Golden Pheasant Drive. The types of Work to be performed include but are not limited to the following: A. Furnish and install new prefabricated booster pump station building including: Booster Pumps Automatic Transfer Switch (ATS) Electrical Pump Controls Pump Control Panel and SCADA System Electrical Distribution Panels B. Furnish and install ductile iron (DI) watermain piping, fittings, check valves and isolation valves. C. Furnish and install diesel engine standby generator. D. Furnish and install flow meter. E. Electric service installation. F. Site restoration. G. Sanitary sewer service. H. Three (3) remote site with underground precast concrete vaults containing pressure sustaining valves and associated piping.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents