Similar Projects
FY20 Duluth Vessel Yard Repairs
Results
$5,000,000 to $10,000,000 est. value
Duluth, MN 55802

Relocate Osceola Landing Boat Launch Area
Results
$1,000,000 to $5,000,000 est. value
Shafer, MN 55074

All-Aluminum Floating Dock Systems
Term Contract
Results
$25,000 to $100,000 est. value
McGregor, MN 55760

Relocate Osceola Landing Boat Launch Area
Results
$1,000,000 to $5,000,000 est. value
Shafer, MN 55074

2021 Municipal Dock Expansion
Infrastructure
Results
Tonka Bay, MN

Area 3B Lake O'Dowd WAS Ramp Replacement
Infrastructure
Post-Bid
Shakopee, MN 55379

Boat Ramp and Dock Replacement Sandy Lake Recreation Area
Term Contract
Post-Bid
$100,000 to $250,000 est. value
McGregor, MN 55760

MN-Replace Fishing and Canoe Launch Platforms
Term Contract
Results
$25,000 to $100,000 est. value
MN

DNR3 Area 3B Forest Lake 2 PWA Ramp Replacement
Post-Bid
Forest Lake, MN 55025

Lake Superior Grand Marais Water Access
Infrastructure
Results
Grand Marais, MN

Lake Superior Grand Marais Breakwater
Results
Less than $1,842,220 est. value
Grand Marais, MN

Ranier Boat Launch and Parking Lot Construction Project
Infrastructure
Results
$215,271 est. value
Ranier, MN

Last Updated 02/03/2022 08:40 AM
Project Title

Knife River Marina Dock Install and Removal

Physical Address View project details and contacts
City, State (County) Knife River, MN 55609   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered under this solicitation shall consist of the labor, equipment, materials, tools, transportation, and incidentals necessary to: The seasonal installation and removal of Department of Natural Resources floating docks at the Knife River Marina in Knife River, Minnesota. 32 docks will be installed in the spring of 2022 and 2023 and 32 docks will need to be removed in the fall of 2022 and 2023.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents