Similar Projects
JCK IRS Consolidation – CMc Services
Renovation
Post-Bid
$6,000,000 to $8,000,000 est. value
Chicago, IL 60604

Construction Management Services
Post-Bid
IL

Reported 10/03/2020 12:00 AM
Project Title

Capacity, Management, Operations, and Maintenance Plan (CMOM)

Physical Address View project details and contacts
City, State (County) Rock Island, IL 61201   (Rock Island County)
Category(s) Professional Services
Sub-Category(s) Commissioning
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The objective of this project is to develop and submit a completed CMOM Plan for the Mill Street Wastewater Treatment Plant that meets the NPDES permit requirements. The project is divided into two tasks: Task 1: Information Request and Review and CMOM Plan Outline Identify and request existing information related to the permitted items A, B, C, D, E, and F listed under the SPECIAL CONDITION 18 in the attached Appendix A. Organize the information and determine missing information required to meet the permit. Conduct Workshop 1 with City Staff to codify and/or develop the missing information that may include SPECIAL CONDITION 18 items A.3, A.5, and A.6. Discuss SPECIAL CONDITION 18 items A.8.a, A.8.b, A.8.c, A.8.d, and A.8.e, for each asset. The objective of Workshop 1 is to create the outline for the CMOM Plan and gather the information required to draft the CMOM Plan Task 2: CMOM Plan Development Prepare the draft and final CMOM Plans that include all permitted items reviewed and discussed in Task 1. For SPECIAL CONDITION 18 items A.7 and A.8, develop a simplistic asset management tool to prioritize improvements. Workshop 2 will be conducted to review the Draft CMOM Plan and the asset management tool with the City of Rock Island. Comments received from Workshop 2 will be incorporated into the Final CMOM Plan for submission to the IEPA.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents