Koop Creek Aqueduct Interim Risk Reduction Measures
Results
$397,370 est. value
Saint Marys, OH

Fabric Concrete Bag Reventment
Results

Construction of the Rogers #2 Ditch
Results
Less than $115,599 est. value
OH

Construction of the Paul Joint Tile Ditch Project
Results
Less than $150,366 est. value
Wapakoneta, OH

Box Culverts
Results

Concrete Pipes
Results

Slide Repair - IR275-2.62 (55.70)
Results

The Construction of the Spallinger Ditch
Results
Wapakoneta, OH

Haruff #2 Bid
Results
Less than $17,962 est. value
Wapakoneta, OH 45895

Culvert Invert Paving
Term Contract
Results

Sharlon Ditch
Results
Wapakoneta, OH

Box Culverts
Results

Concrete Pipes
Results

Shindollar Ditch
Results
Less than $18,126 est. value
Wapakoneta, OH 45895

Precast Catch Basins, Risers, and Grates
Term Contract
Results

Last Updated 06/11/2019 10:25 AM
Project Title

Six Mile Creek Aqueduct Restoration

Physical Address View project details and contacts
City, State (County) Saint Marys, OH   (Auglaize County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $671,080
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The purpose of the project is to restore the recently damaged historic aqueduct structure by replacing the failed northwest wingwall, reinforce the existing southwest wingwall, and perform associated concrete, masonry, and stone channel lining improvements. The general scope of work includes: Water Control 1. Contractor to prepare water control plan sealed by a registered Ohio Professional Engineer. 2. Furnish and Install approved water control plan to manage conveyance of Six Mile Creek and Miami and Erie Canal to accommodate aqueduct structure repairs in the dry. 3. Divert or remove water from all areas of the project where permanent work is to be performed, install or construct facilities, cofferdams, diversion pipes/channels/berms, sumps, and pumping facilities as required. 4. Designing and maintaining temporary diversion facilities and for protecting the work area from flooding. Northwest Wingwall Replacement 1. Demo existing wingwall stone foundation. 2. Furnish and install reinforced concrete drilled shaft with precast concrete panel wingwall. 3. Furnish and install stone masonry veneer to match existing historic masonry. North Abutment Wall Restoration 1. Restore failed portion of stone masonry abutment wall with reinforced concrete column 2. Furnish and install soil nail tie-back anchors and steel bearing plate in existing stone masonry abutment wall. 3. Furnish and install stone masonry veneer to match existing historic masonry. Southwest Wingwall Restoration 1. Furnish and install soil nail tie-back anchor in lower portion of existing wingwall. 2. Furnish and install stone masonry veneer over anchor to match existing historic masonry. 3. Salvage and rebuild lower portion of existing stone masonry wingwall with drainage improvements. Aqueduct Structure Repairs 1. Furnish and install concrete crack seal for canal arch, two (2) tow path arches, and two canal headwalls. 2. Furnish and install concrete repair/resurfacing of spalled canal arch and two (2) tow path arches. 3. Furnish and install tuck-point repair of existing stone masonry throughout entire aqueduct structure as directed by engineer. 4. Furnish and install missing stacked stone channel lining and fluid grout joints while maintaining geometry of low flow channel. 5. Furnish and install canal arch spillway drip edge surface protection. Site Restoration 1. Furnish and Install precast tied concrete mat on embankments with soil infill per plan. 2. Furnish and Install rock channel protection of wingwalls per plan. 3. Final grade and restore project area with erosion control blankets and native grass seed.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans