Similar Projects
Construction of Regional Lift Station and Local Lift Station Number 2 for Chapel Run
New Construction
Post-Bid
TX

WWTP Lift Station
New Construction
Post-Bid
TX 77356

Sewer Lift Station
Term Contract
Results
Less than $637,000 est. value
Harlingen, TX 78552

Lift Station Rehabilitation for Elkins (No. 24), Baybridge (No. 28), Commonwealth (No. 30) and Auburn Trails (No. 401)
Results
Less than $1,657,000 est. value
Sugar Land, TX 77479

Bay Colony Lift Station Expansion Phase I
Construction
League City, TX 77573

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Bird Creek Basin Wastewater Projects
New Construction
Pending Verification
$5,400,000 est. value
Temple, TX

Lift Station and Waste Water Treatment Plant Site Improvements to Serve Oxford Place Phase 1
Alteration
Post-Bid
McKinney, TX

Lake Fort Phantom Hill Pump Station Improvements
Results
$2,000,000 est. value
Abilene, TX 79601

Village Creek Water Reclamation Facility South Flow Lift Station
New Construction
Construction
$19,993,000 est. value
Fort Worth, TX

Rebuild Raw Water Transfer Pump and Repair High Service Pump
New Construction
Post-Bid
Port Arthur, TX

Westside Water Well and Booster Pump Station - Calder Road
Results
League City, TX 77573

Diesel Engines and Reduction Gears for Ninth Ave Pump Station (Pump Station #19) - DD7
New Construction
Post-Bid
Port Arthur, TX

Lift Station 1 and 4 Improvements
Results
Less than $161,000 est. value
TX

Turner`s Crossing Booster Pump Station
New Construction
Post-Bid
Buda, TX

Last Updated 08/29/2022 12:25 PM
Project Title

Northwest Booster Pump Station

Physical Address View project details and contacts
City, State (County) Saginaw, TX 76179   (Tarrant County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,278,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The major work will consist of installation of a booster pump station consisting of (1) fiberglass building and prefabricated pump skid system. The project will also consist of approximately 200 linear feet of 12" ductile iron water line and a liquid propane generator and tank. The project includes integrating the proposed pumping system into the City's existing SCADA system. This work shall be performed by WHECO Electric, Inc. The deadline to ask questions is 6/25/2022 2:00 PM CST

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents