Similar Projects
Susan E WIley & Deauville Gardens ES Boiler Replacement
Renovation, Alteration
Post-Bid
Copiague, NY 11726

William Floyd D2 HS Field House Press Box
Alteration
Post-Bid
$70,000 to $110,000 est. value
Mastic Beach, NY 11951

Oldfield MS Library
Renovation
Results
$1,548,000 est. value
Greenlawn, NY 11740

Districtwide Capital Improvements New Field House (Bond Phase III)
New Construction
Results
$38,636,480 est. value
Port Jefferson Station, NY

Longwood Middle School Gymnasium Alterations - Contract E Electrical Construction
Renovation
Post-Bid
$250,000 CJ est. value
Middle Island, NY 11953

Combination of Bond Phase 2, 3 and 4
New Construction
Results
Bohemia, Ronkonkoma, NY 11716

Bond Phase 3 - Building Improvements at Elwood Middle School
Renovation
Post-Bid
$4,090,000 est. value
Greenlawn, NY 11740

Welding Classroom at Islip Career Center (ICC)
New Construction
Results
$375,000 est. value
West Sayville, NY 11796

Roof Reconstruction (Coatings) at Wading River Elementary School and Prodell Middle School
Renovation
Post-Bid
$200,000 CJ est. value
Wading River, NY 11792

District Maintenance Building
Renovation
Results
Islip Terrace, NY 11752

Building Renovation Work at Riverhead Charter School
Renovation
Post-Bid
Riverhead, NY 11901

High School East Window Replacement
Alteration
Results
Dix Hills, NY 11746

District-Wide Capital Improvements -West Islip HS, Beach ST. MS, Udall Rd. MS, Bayview ES, Manetuck ES, Oquenock ES and Paul J. Bellew ES
Renovation
Post-Bid
$1,700,000 est. value
West Islip, NY 11795

Goosehill Primary School
New Construction
Results
$1,500,000 est. value
Cold Spring Harbor, NY 11724

2017 Bond Issue Related Capital Improvement Program - Contract 2 - Window Replacement
Renovation
Post-Bid
$1,182,000 CJ est. value
Lindenhurst, NY 11757

Last Updated 10/06/2022 08:29 AM
Project Title

Localized Interior Renovations at Existing Tech Wing and New Stem Lab at Hauppauge High School.

Physical Address View project details and contacts
City, State (County) Hauppauge, NY 11788   (Suffolk County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $588,100 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Localized Interior Renovations at Existing Tech Wing & New STEM Lab at Hauppauge High School. The Contract Documents may be examined at the Office of the Architect, BBS Architects, Landscape Architects and Engineers, P.C., 244 East Main Street, Patchogue New York, (631-475-0349)Complete digital sets of Contract Documents shall be obtained online (with a free user account) as a download for a non-refundable fee of Forty-Nine ( 49.00) Dollars at the following portal Checks for deposits shall be made payable to the HAUPPAUGE UNION FREE SCHOOL DISTRICT and may be uncertified. All bid addenda will be transmitted to registered plan holders via email and will be available at the above referenced websites. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Plan holders who have obtained hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. The bid deposit for hard copies will be returned upon receipt of plans and specifications, in good condition, within thirty days after bid date, except for the lowest responsible bidder, whose check will be forfeited upon the award of the contract. The Contract will be awarded to the lowest responsible bidder or the proposals will be rejected within 60 days of the date of opening proposals. Bids shall be subject, however, to the discretionary right reserved by the School District to waive any informalities in, accept or reject any alternatives, reject any proposals and to advertise for new proposals, if in its opinion the best interest of the School District will thereby be promoted. Each bidder may not withdraw his bid within 60 days after the formal opening thereof. A bidder may withdraw his bid only in writing and prior to the bid opening date. To comply with current social distancing requirements, pre-bid walkthroughs will be made on an individual basis only. Bidders to contact District Facilities Director Ernesto Rosini at (631) 265-3045 to arrange for an individual walkthrough, accompanied by District personnel. All participants to provide and wear face masks/coverings for said walkthroughs. Due to the ongoing COVID-19 pandemic and the resulting uncertainty with regard to when the Owner's schools will be in session during the 2021-2022 school year, the restrictions, if any, applicable to construction activities in the Owner's facilities as a result of State, Federal or Local orders, laws, regulations or rules related to the COVID-19 pandemic (including but not limited to prevention measures of social distancing and disinfecting), and the duration of any such restrictions, the Owner may modify the construction schedule, including the anticipated start date, set forth in the Contract/Bid Documents. By submitting a bid, the Bidder consents to any such schedule modification and further acknowledges and agrees that there shall be no additional compensation for schedule modifications caused directly or indirectly by the COVID-19 pandemic. The Bidder further acknowledges and agrees that the sole remedy for any schedule modifications or delays caused directly or indirectly by the COVID-19 pandemic shall be an extension of time, to be determined in the sole discretion of the Owner.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents