Last Updated 06/29/2020 11:29 AM
Project Title

Water System Improvements Repair and Painting Highway 9 Elevated Tank

Physical Address View project details and contacts
City, State (County) Dillon, SC 29536   (Dillon County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be completed consists of furnishing all materials, equipment, and labor necessary to: Hwy #9 Elevated Water Tank: Repair, prep, clean, blast interior and exterior and paint/finish the interior and exterior surfaces of the tank as indicated or specified and as needed for a complete and proper installation. Reservoir Painting and Repairs: Chemical injection grout leaks in reservoir walls. Prepare, clean, paint/finish the exterior vertical concrete walls of the concrete reservoir tank. Prepare, clean, paint/finish all of the exterior/exposed ductile iron piping, valves, pumps and motors on/around the reservoir. Prepare, clean, paint/finish all of the exterior/exposed ductile iron piping, valves, pumps and motors on/around the well pump. Replace handrail baseplate, electrodes, etc. Building Painting and Repairs: Remove existing resilient floor inside building (office/laboratory and bathroom). Assume floor tile contains asbestos. Properly remove and dispose of the tile floor. Paint concrete floors in laboratory/office, bathroom, electrical room and chemical room). Prepare, clean, paint/finish interior walls and ceiling (electrical room and chemical room) . Replace doors, replace building fascia, repair building roof, etc.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents