Similar Projects
New Oliver Wolcott Technical School Building - Connecticut Technical High School System
New Construction, Infrastructure
Conception
$120,000,000 CJ est. value
Torrington, CT 06790

RFP Engineering - Architectural/Engineering Analysis of the Former Caprilands Site
Infrastructure
Conception
$20,000 CJ est. value
Coventry, CT 06238

The Lizzie and Jonathan Tisch Center for Innovation and Active Citizenship
New Construction, Demolition
Design
$25,000,000 est. value
Washington, CT 06793

Molecular & Life Science Building - Wesleyan University
New Construction, Build-out, Renovation, Infrastructure - 193,000 SF
Design
$10,000,000 CJ est. value
Middletown, CT 06459

Condenser Water Pipe Replacement
Renovation
Bidding
$1,000,000 CJ est. value
Waterbury, CT 06708

RFQ Construction Manager at Risk - South Campus Infrastructure
New Construction, Renovation, Infrastructure
Post-Bid
$62,500,000 CJ est. value
Storrs Mansfield, CT 06269

Radiation Oncology Exam Rooms
Renovation - 1,100 SF
Post-Bid
$300,000 est. value
Farmington, CT 06030

Student Union Office Renovations
- 1,000 SF
Results
$100,000 to $500,000 est. value
Storrs, CT 06269

Advising Center and Computer Lab Renovations
Renovation
Results
$200,000 est. value
Bridgeport, CT 06604

Danbury Career Academy - City of Danbury
New Construction, Infrastructure
Construction
$164,000,000 CJ est. value
Danbury, CT 06810

Quinnipiac University South Quad
Demolition, New Construction, Infrastructure - 216,000 SF
Construction
$244,000,000 CJ est. value
Hamden, CT 06518

Hopkins School Lovell Hall Expansion
Addition, Renovation - 138,282 SF
Pending Verification
$3,000,000 CJ est. value
New Haven, CT 06515

Wesleyan University - Arts Program
Addition, Demolition, Renovation, Infrastructure - 34,858 SF
Pending Verification
$11,800,000 CJ est. value
Middletown, CT 06457

HVAC Upgrades at Three Rivers Community College
Renovation
Design
$200,000 CJ est. value
Norwich, CT 06360

RFQ Contractor - Building F and H Hot Water Tanks
Renovation
Post-Bid
$700,000 CJ est. value
Farmington, CT 06030

Last Updated 10/18/2023 08:44 AM
Project Title

Charter Oak State College Relocation

Physical Address View project details and contacts
City, State (County) New Britain, CT 06051   (Hartford County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $3,938,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Costs: Greater Than $500,000 Set-Aside Requirements: SBE Subcontractors &/or Suppliers: 25%; MBE Subcontractors &/or Suppliers: 6.25% Cost Estimate Range: $ 3,864,339.00 To $ 4,271,112.00 Contract Time Allowed: Calendar Days: 270 Liquidated Damages: $ 1,948.00 Per Calendar Day Beyond Substantial Completion. $ 1,625.00 Per Calendar Day Beyond 90 days After Substantial Completion. Prevailing wages are required on this project, in accordance with the schedule provided in Section 00 73 44 Prevailing Wage Rates, pursuant to Connecticut General Statutes (C.G.S.) Section 31-53 (a) through (h), as amended. Each contractor who is awarded a contract on or after October 1, 2002 shall be subject to provisions of C.G.S. 31-55a concerning annual adjustments to prevailing wages. All Project Questions, Bid Questions, and Pre-Bid Equals and Substitution Requests must be submitted fourteen (14) Calendar Days prior to the Bid Due Date. All Project Questions and Pre-Bid Equals and Substitution Requests must be emailed (not phoned) to the Architect/Engineer with a copy to the Construction Administrator and the DAS/CS Project Manager listed below. Architect/Engineer: Northeast Collaborative Architects Email: jscheib@ncarchitects.com Construction Administrator: Construction Advocacy Professionals, LLC Email: antonietta@capyourbudget.com DAS/CS Project Manager: Daniel Wagoner Email: Daniel.Wagoner@ct.gov All Bid Questions must be emailed to the DAS/CS Paralegal Specialist listed below. DAS/CS Paralegal Specialist: Alison Kulas Email: Alison.Kulas@ct.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.Construction Costs: Greater Than $500,000 Set-Aside Requirements: SBE Subcontractors &/or Suppliers: 25%; MBE Subcontractors &/or Suppliers: 6.25% Cost Estimate Range: $ 3,864,339.00 To $ 4,271,112.00 Contract Time Allowed: Calendar Days: 270 Liquidated Damages: $ 1,948.00 Per Calendar Day Beyond Substantial Completion. $ 1,625.00 Per Calendar Day Beyond 90 days After Substantial Completion. Prevailing wages are required on this project, in accordance with the schedule provided in Section 00 73 44 Prevailing Wage Rates, pursuant to Connecticut General Statutes (C.G.S.) Section 31-53 (a) through (h), as amended. Each contractor who is awarded a contract on or after October 1, 2002 shall be subject to provisions of C.G.S. 31-55a concerning annual adjustments to prevailing wages. All Project Questions, Bid Questions, and Pre-Bid Equals and Substitution Requests must be submitted fourteen (14) Calendar Days prior to the Bid Due Date. All Project Questions and Pre-Bid Equals and Substitution Requests must be emailed (not phoned) to the Architect/Engineer with a copy to the Construction Administrator and the DAS/CS Project Manager listed below. Architect/Engineer: Northeast Collaborative Architects Email: jscheib@ncarchitects.com Construction Administrator: Construction Advocacy Professionals, LLC Email: antonietta@capyourbudget.com DAS/CS Project Manager: Daniel Wagoner Email: Daniel.Wagoner@ct.gov All Bid Questions must be emailed to the DAS/CS Paralegal Specialist listed below. DAS/CS Paralegal Specialist: Alison Kulas Email: Alison.Kulas@ct.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The deadline for Pre-Bid Requests for Information (RFIs) is 5:00pm on Wednesday, February 2

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents