Similar Projects
Greenways at Sand Creek
New Construction
Conception
Colorado Springs, CO 80922

Chestnuts On The Creek
New Construction
Conception
Colorado Springs, CO 80907

Apartments
New Construction
Design
Colorado Springs, CO

Academy Heights Apartments
New Construction - 158,526 SF
Design
Colorado Springs, CO

Softball Fields Improvements
New Construction
Bidding
Colorado Springs, CO 80906

Springstone
New Construction - 260,000 SF
Post-Bid
Colorado Springs, CO 80901

Springstone
New Construction - 260,000 SF
Post-Bid
Colorado Springs, CO 80901

New Construction of Two South Slope Houses
New Construction
Results
Colorado Springs, CO 80947

Paint Mines Interpretive Park Restoration Project
Results
Calhan, CO 80808

Rio Grande Apartments
New Construction - 285,784 SF
Construction
$8,000,000 to $10,000,000 est. value
Colorado Springs, CO 80900

430 West Pikes Peak Apartments
New Construction - 10,500 SF
Construction
$2,000,000 est. value
Colorado Springs, CO 80904

Polaris Pointe Apartments
New Construction
Pending Verification
Colorado Springs, CO

Reagan Ranch
New Construction
Pending Verification
Colorado Springs, CO 80929

Kaleidos
New Construction
Conception
Colorado Springs, CO 80916

Victory Ridge Apartments
New Construction
Design
Colorado Springs, CO 80900

Last Updated 06/02/2021 05:34 PM
Project Title

Elan Pikes Peak

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80903   (El Paso County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Park/Playground
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced January 2021, Construction Completion Expected first quarter 2023
Bids Due View project details and contacts
Estimated Value $96,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

192,000 SF - Apartments/Condominiums, 6 Stories Above Grade, 154,000 to 439,000 SF New Construction, 321 Unit(s), Clubhouse/Social Club, 13,000 SF New Construction, Park/Playground, 25,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Swimming Pools.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents