Similar Projects
Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Grandview Street and Sidewalk Improvements Rebid
Infrastructure
Bidding
$188,200 CJ est. value
Oceanside, CA 92054

Newport Beach Pump Stations Pressurization Improvements
Renovation, Infrastructure
Bidding
$1,412,000 CJ est. value
Santa Ana, CA 92708

Plumbing Services
Term Contract
Sub-Bidding
Ventura, CA 93003

Plumbing - Emergency and After Hour Services - City Owned Facilities
Term Contract
Sub-Bidding
$30,000 CJ est. value
Clearlake, CA 95422

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Plumbing Services
Term Contract
Results
$200,000 est. value
San Jose, CA 95128

Plumbing Contractor
Term Contract
Results
Concord, CA

Sugarloaf Water System Improvement Project
Renovation, Infrastructure
Bidding
$2,300,000 CJ est. value
Lakehead, CA 96051

Plumbing Contractor Services and Repairs
Term Contract
Sub-Bidding
Concord, CA 94520

Plumbing Services BPA
Term Contract, Alteration
Post-Bid
Edwards, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Pump Stations Chemical System Improvements
Renovation
Bidding
$8,600,000 CJ est. value
Union, CA 94558

Cured-In-Place-Pipe (CIPP) Services
Term Contract
Sub-Bidding
Sacramento, CA 95814

Last Updated 10/17/2022 04:08 AM
Project Title

RFQ Contractor - Prequalification Job Order Contract (JOC) Plumbing

Physical Address View project details and contacts
City, State (County) Davis, CA 95616   (Yolo County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this Job Order Contract is to provide all labor, equipment and materials for plumbing deferred maintenance projects, costing between $20,000 and $600,000 per Job Order. All projects will not exceed a total work value of $1,500,000 per Option Year. The scope will include repair to and/or replacements of existing building plumbing systems and fixtures units with the possibility of ancillary finish work as a result of the plumbing-based project, and existing hazardous material remediation. The scope may include accessibility improvements and Fire/Life Safety upgrades and project-related repairs and/or replacements of finishes. electrical work. Work may require interaction with Universitys shops staff during project delivery. Work will take place at UC Davis sites in Yolo and/or Solano Counties. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents