Similar Projects
Wet Utilities Job Order Contract-Multiple Locations
Demolition
Design
$2,000 to $1,000,000 est. value
Washington, DC - Indian Head, Patuxent River, MD - Dahlgren, VA

Construction of the Hurley Phase X (Hunts Fork Road) Waterline Extension
Infrastructure
Bidding
Vansant, VA

Innovation Village Utility Extension
Infrastructure
Bidding
Harrisonburg, VA

On-Call Wet Utlities Services
Post-Bid
Alexandria, VA

Water Meters
Post-Bid
VA

Replace Potable Water Line
Results
Norfolk, VA

Water Main Installation and Service Contract - Step II
Results
Less than $13,550,280 est. value
Fairfax, VA 22031

Morven Park Road Waterline Improvements Project
Infrastructure
Bidding
Leesburg, VA 20176

Large Domestic and Fire Line Water Meters
Post-Bid
VA

Leesburg Pike and South Van Dorn Street Water Main Replacements
Results
Fairfax, VA 22031

On-Call Water and Sewer Line Repair and Construction
Term Contract
Bidding
VA

Perform Advanced Metering Infrastructure (AMI) Maintenance
Post-Bid
Portsmouth, VA

Furnish and Deliver Fire Hydrants
Term Contract
Results
$238,651 est. value
Fairfax, VA 22031

Automated Water Meter Upgrade
Infrastructure
Bidding
Bridgewater, VA

Maintenance Services for Water Filtration System
Post-Bid
Portsmouth, VA

Reported 08/23/2021 02:13 PM
Project Title

Sewer Line Inspection - Phase 2

Physical Address View project details and contacts
City, State (County) Ashburn, VA   (Loudoun County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Establish an agreement for the second phase of inspections of sewer section S-61. The map area represents approximately 10,420 linear feet of 42 inch-diameter concrete sewer located in Loudoun County, Virginia (See the attachments in IonWave). Manhole depths range from ten to twenty (10-20 ft). There are areas of the sewer that have debris. To date no inspections have been done for this particular sewer section and the average amount of flow in the sewer line 1.3 mgd (million gallons per day).

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents