Similar Projects
Fire Station 11 and 13 HVAC Improvements
Renovation
Sub-Bidding
$1,100,000 CJ est. value
Tacoma, WA 98404

Master Contract for HVAC Service - Statewide Opportunities
Term Contract
Post-Bid

Residential DHP Installation
Infrastructure
Post-Bid
WA

Weatherization - Residential Ductless Heat Pump Installation 2
Alteration
Results
WA

County-City Building Property Room Exhaust Addition
Alteration
Results
$100,000 est. value
Tacoma, WA 98402

Mechanical MATOC
Term Contract
Post-Bid
$2,000 to $500,000 est. value
WA

WCCW MSU Building Climate Control Improvements
Alteration
Results
$860,000 to $1,010,000 est. value
Gig Harbor, WA 98332

Repair of Emergency Boiler
Term Contract, Alteration
Post-Bid
$100,000 to $250,000 est. value
Tacoma, WA 98431

Weatherization Residential Insulation 8550
Alteration
Results
Eatonville, WA

MHR Urgent Residential HVAC
Alteration
Post-Bid
Tacoma, WA

WX Residential Weatherization 8556
Alteration
Results
Puyallup, WA 98371

Air Filters for HVAC
Term Contract, Alteration
Post-Bid
Tacoma, WA

WX Residential Weatherization 8567
Alteration
Results
Puyallup, WA

128Th St Booster Station And Generator
New Construction, Infrastructure, Alteration
Post-Bid
$1,945,000 to $2,145,000 est. value

Residential Weatherization 8573
Alteration
Results
Bonney Lake, WA 98391

Last Updated 02/07/2023 11:21 AM
Project Title

Residential HAVC Replacement with Fuel Switch (Oil to Heat Pump Air Handler)

Physical Address View project details and contacts
City, State (County) Tacoma, WA 98405   (Pierce County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $15,800 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Having carefully examined all QUOTE DOCUMENTS prepared by Pierce County, as well as the premises and conditions affecting the work, the Undersigned proposes to furnish all labor, equipment, and materials and perform all work, in accordance with the terms & conditions and prevailing wage requirements attached, which price is hereby designated as to the total proposal price for all necessary work. Replace residential oil furnace with heat pump air handler. Question Submission Deadline:December 5, 2022, 2:00pm Bonds and Retainage. A bid bond will not be required for this work. For Public Works contracts less than or equal to $50,000 including tax and purchase services contracts which include services requiring the payment of prevailing wages less than or equal to $50,000 including tax, the County shall waive retainage and bonding but will retain the right of recovery against the Contract for any payments made on the Contractors behalf. Contract Time: The notice to proceed will be issued within five (5) to ten (10) calendar days of the execution of the Contract by the County. Should there be reasons why the notice to proceed cannot be issued within such period, the time may be extended by mutual agreement between the County and Contractor. This project requires the payment of prevailing wages per chapter 39.12 RCW. Workers shall receive no less than the prevailing rate of wage for their work on this locally funded project. Award has been recommended to: Resicon LLC

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents