Similar Projects
Coliseum Medical Centers Freestanding Emergency Department
New Construction, Infrastructure
Conception
$11,928,250 CJ est. value
Bonaire, GA 31005

RFQ - Retention Pond Maintenance at Cohen Walker Drive
Renovation, Infrastructure
Bidding
$150,000 CJ est. value
Warner Robins, GA 31088

Retention Pond Maintenance at Falls Drive
Renovation, Infrastructure
Bidding
$280,000 CJ est. value
Warner Robins, GA 31005

Perry Fieldhouse Site Improvements
Infrastructure
Post-Bid
GA

Joint 2022 Local Maintenance and Improvement Grant
Infrastructure
Post-Bid
Byron, Centerville, Perry, Warner Robins, GA

Mass Paving
Infrastructure
Results
GA

Mass Paving
Infrastructure
Results
GA

CRH Healthcare Shell Building / Bonaire
New Construction, Infrastructure - 4,000 SF
Construction
$800,000 CJ est. value
Bonaire, GA 31005

Perry-Houston County Airport - City of Perry
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Perry, GA 31069

Bob White Storage Expansion / Perry
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$500,000 CJ est. value
Perry, GA 31069

USACE DLA Hardstand Lot, Robins AFB, GA
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Warner Robins, GA 31093

Matt Arthur Elementary Parent Drop Off Improvements
Infrastructure
Post-Bid
Kathleen, GA 31047

Signing, Pavement Markings Upgrades and Shoulder Rehabilitation on Various County Roads
Infrastructure
Results
GA

Ashley Drive Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$93,000,000 CJ est. value
Perry, GA 31069

Perdue Elementary Parking Lot Expansion
Alteration
Post-Bid
Warner Robins, GA 31088

Last Updated 05/09/2023 12:03 AM
Project Title

Feagin Mill Middle School Parking Lot Expansion and Re-Surfacing

Physical Address View project details and contacts
City, State (County) Warner Robins, GA 31088   (Houston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $697,204 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 8, 2023. The project has been awarded with the amount of $697,204.26. All bidders shall provide their signed E-Verify affidavit with their bid. Bids will not be considered without the Contractor affidavit. The successful bidder is responsible for obtaining a signed E-verify affidavit from their Subcontractors and Sub- subcontractors. The work to be done shall consist of furnishing all labor, equipment and materials necessary to expand the front parking lot and resurface existing parking at Feagin Mill Middle School for the Houston County School District as shown on the plans. Construction shall consist of grading, curbing, storm drain, paving, and striping. The Bidder shall hold a current Contractor's License issued by the Georgia State Construction Industry License Board All bid bonds must be accompanied by a Bid Bond in an amount of not less than five percent (5%) of the bid amount. The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond in the amount of one hundred percent (100%) of the Contract amount and a Payment Bond in the amount of one hundred percent (100%) of the Contract amount. This project will adhere to City of Warner Robins Specifications The Owner reserves the right to reject any or all bids, to waive informalities, and to re-advertise.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents