Similar Projects
Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

Quincy Regional Airport - New Apron, Taxi Lane, and Road
New Construction, Infrastructure
Design
$2,400,000 CJ est. value
Quincy, IL 62305

Culvert Replacement
Infrastructure
Bidding
$800,000 CJ est. value
Quincy, IL 62301

500,000 Gallon Water Storage Tank Painting
Renovation, Infrastructure
Bidding
$30,000 CJ est. value
Camp Point, IL 62320

Concrete Replacement Work at Indian Hills (IL 16-1)
Infrastructure
Post-Bid
$130,000 CJ est. value
Quincy, IL 62301

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Madison Park Shelter Replacement
New Construction
Results
$100,000 est. value
Quincy, IL

Quincy Regional Barge Dock Improvements
Infrastructure
Results
$3,420,000 CJ est. value
Quincy, IL 62301

Quincy Medical Group Hospital
New Construction, Infrastructure - 68,000 SF
Pending Verification
$61,142,058 CJ est. value
Quincy, IL 62301

Concrete Sidewalk Replacement
Infrastructure
Post-Bid
$24,500 CJ est. value
Liberty, IL 62347

Rock Excavation on I-172
Infrastructure
Results
$500,000 est. value
Quincy, IL 62328

ABS Water Co-Op Interconnect
Infrastructure
Post-Bid
$200,000 CJ est. value
Lima, IL 62376

Project Consists of Class a Patches
Infrastructure
Results
$349,600 CJ est. value
Pittsfield, IL 62363

Exterior Improvements at 108 South Main Street and 414 West Edwards Street
Infrastructure
Post-Bid
$546,000 CJ est. value
Payson, IL 62360

Demolish Water Tower
Infrastructure
Results
$459,620 CJ est. value
Quincy, IL 62301

Last Updated 11/16/2022 11:34 PM
Project Title

New Restroom Building for Adams County Fair

Physical Address View project details and contacts
City, State (County) Mendon, IL 62351   (Adams County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,156,707 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

General contractor bids will be received for the following projects: 1. Base Bid A - A new 30'-0" x 60'-0" restroom building with ICF exterior walls, CMU interior walls, exterior siding, interior FRP panels, a wood truss roof with shingles. a. This project must be substantially completed by May 31, 2023. 2. Base Bid B - A new 30'-0" x 60'-0" restroom building with CMU walls, CMU interior walls, a wood truss roof with shingles. a. This project must be substantially completed by May 31, 2023. Bid security shall be submitted with each bid in the amount of 5 percent of the bid amount FOR EACH BID OFFERED. No bids may be withdrawn for a period of 60 days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time. Work is not subject to liquidated damages. Prevailing wage rates do not apply to this project. This project is exempt from sales tax. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner may be required of the successful Bidder. Provide performance bond cost on the bid form. If the owner determines that a performance bond is required, the contract amount will include the cost. Online Procurement and Contracting Documents: Obtain access after September 16, 2022, by contacting the Architect. Online access will be provided to all registered bidders and suppliers. 1. Non-Refundable Cost: $50.00. 2. Contractors and Vendors are solely responsible for ensuring that all drawing sheets and full Project Manuals have been downloaded by checking the Index of Drawings on the Title page of the drawings, the List of Drawing Sheets in the Project Manual, and the Table of Contents in the Project Manual. Notify the Architect immediately if there are discrepancies. Bid Results- 1. Total Base Bid 'A' - Bleigh Construction - $ 587,690 2. Total Base Bid 'B' - Bleigh Construction - $ 569,017

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents