Similar Projects
Sturgis I-90 Crossing and Booster Station
New Construction
Bidding
Sturgis, SD

Lake Norden Main Lift Station Improvements
Results
$575,000 to $600,000 est. value
Lake Norden, SD 57248

Creek Lift Station and Force Main
New Construction
Post-Bid
SD

Pump Station 240 Capacity Improvements
Post-Bid
Less than $5,687,511 est. value
Sioux Falls, SD 57110

Mitchell Dailey Drive Lift Station
Results
$1,284,738 est. value
Mitchell, SD 57301

MCWC EROS Control Valve Station
New Construction
Bidding
Dell Rapids, SD

Wastewater System Improvements
Results
Delmont, SD

Pump Station 218 Improvements - Tuthill
Results
$1,850,000 est. value
Sioux Falls, SD 57105

Lift Station and Forcemain Installation
New Construction, Infrastructure
Post-Bid
$515,000 est. value
Hudson, SD

West Lift Station
New Construction
Results
$330,000 est. value
Elkton, SD

Harrisburg Pooling Point
New Construction - 80 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Worthing, SD

Pump Station 203 Improvements
Post-Bid
$2,150,000 est. value
Sioux Falls, SD

Meter Buildings
Renovation
Results
$1,800,000 to $2,250,000 est. value
Hull, Sioux Center, IA - Beresford, SD

Reported 06/15/2021 12:00 AM
Project Title

East Farmer Avenue Lift Station Replacement

Physical Address View project details and contacts
City, State (County) Howard, SD 57349   (Miner County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected June 2022
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement Removals, Lift Station Removal, Erosion Control, Traffic Control, Base Course, Asphalt Concrete, Sanitary Sewer, Lift Station and Miscellaneous Items

Details

Lift and Pump Stations, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents