Similar Projects
School Zone Upgrades at Specht Elementary and Pieper Ranch Middle School
Post-Bid
Less than $114,000 est. value
San Antonio, TX 78260

SCUCISD HVAC Renovations
Renovation, Demolition
Post-Bid
Schertz, TX 78154

Great Hearts Gateway Preparatory Academy
New Construction - 55,000 SF
Results
Less than $9,315,000 est. value
Live Oak, TX 78233

Science Lab Additions/Renovations at Luna Middle School
Renovation, Addition
Results
Less than $4,085,000 est. value
San Antonio, TX 78253

Construction of Idea Converse Academy
New Construction, Addition - 79,600 SF
Construction
$13,000,000 est. value
Converse, TX

Administration Replacement and Cafeteria Upgrades at Pat Neff Middle School
Construction
Less than $11,200,000 est. value
San Antonio, TX 78238

Great Hearts Forest Heights Academy Phase 2
New Construction - 54,877 SF
Pending Verification
$9,000,000 est. value
San Antonio, TX 78240

Northside ISD Galm Road Area HS Package 3 - Building
New Construction - 430,000 SF
Post-Bid
San Antonio, TX 78254

Child Nutrition Warehouse Building Renovation
Renovation
Results
Less than $1,331,089 est. value
San Antonio, TX 78200

New IDEA San Antonio Regional Office
- 15,000 SF
Construction
Less than $3,500,000 est. value
San Antonio, TX 78200

Idea New Regional Admin Office
New Construction - 15,157 SF
Post-Bid
San Antonio, TX 78216

Marshall Law and Medical Services Magnet High School
Results
Less than $26,507,000 est. value
San Antonio, TX 78245

Idea New Regional Office Bid Package #2
New Construction - 15,157 SF
Post-Bid
San Antonio, TX 78216

Addition/Renovation at Anson Jones Magnet School
Renovation, Addition
Results
Less than $4,299,000 est. value
San Antonio, TX 78245

Galm High School Package 4 - Interiors
New Construction - 430,000 SF
Post-Bid
San Antonio, TX 78254

Last Updated 12/30/2019 08:13 AM
Project Title

IDEA South Flores Campus - Phase IV

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78221   (Bexar County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,667,697
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will involve the following site work descriptions: demolition of existing playground equipment, paving, curb and gutter, underground storm water piping, along with the relocation of a competition soccer field and concrete panel fencing. In addition to site demolition work, there will be selective demolition involved with the construction of the new science lab building wing. The building addition will involve the following components: existing conditions, utilities, landscaping, concrete, masonry, metals, wood, plastics and composites, thermal & moisture protection, metal stud walls, roofing, openings, finishes, specialties, equipment, furnishings, fire suppression, plumbing, HVAC, electrical, communications, electronic safety & security, and exterior improvements.

Details

1 Middle/Senior High School, 2 Stories Above Grade, Approximately 4,000 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents