Similar Projects
Superpave Overlay - Paving Contract No. 2
Infrastructure
Bidding
New Cumberland, PA

Micro-Surfacing on Various Township Roads - Paving Contract No. 1
Infrastructure
Bidding
New Cumberland, PA

Milling and Paving of Approximately 2.06 Miles of Roads
Post-Bid
Shippensburg, PA 17257

North Corporation Street Improvement Project
Post-Bid
Newville, PA 17241

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

York Road-Trindle Road Widening
Construction
$1,500,000 to $2,500,000 est. value
Boiling Springs, PA 17007

PA 216 Blooming Grove Rd Resurface
Infrastructure
Bidding
$500,000 to $999,999 est. value
PA

Paving
Post-Bid
Shippensburg, PA

Road Materials Road Paving Road Widening Traffic Line Painting
Results
Carlisle, PA 17015

Micro Surface
Infrastructure
Bidding
Mount Wolf, PA

Seal Coating
Post-Bid
Shippensburg, PA

Road Paving
Results
PA 17015

2022 Willow Springs Lane Paving Project
Infrastructure
Bidding
PA

SuperPave Materials - Street Construction
Post-Bid
Shrewsbury, PA

Reported 02/24/2022 12:00 AM
Project Title

Asphalt Resurfacing

Physical Address View project details and contacts
City, State (County) (Cumberland, York Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for the furnishing of all labor, material, equipment and work necessary for pavement patching, slab stabilization, asphalt milling and resurfacing the left lanes’ wearing course, asphalt milling and resurfacing of the right lanes’ binder and wearing courses. Project also includes the installation of the Sonic Nap Alert Patterns, Permanent Preformed Patterned Reflective Pavement Markings and the Maintenance and Protection of Turnpike traffic. Work items include, but are not limited to: 93 TON Subbase, No 2A 20,338 TON Superpave Asphalt Mix, Wearing Course, PG 64E-22, 9.5MM Mix, SRL-E 14,167 TON Superpave Asphalt Mix, Binder Course, PG 64S-22, 19.0MM Mix 89,230 SY Milling of Asphalt Pavement Surface, to Existing Concrete Pavement 113,035 SY Milling of Asphalt Pavement Surface, 2” Depth 38 CY Asphalt Pavement Patching, Type A 16 CY Asphalt Pavement Patching, Type B 100 CY Concrete Pavement Patching, Type 2 101,044 LB Polyurethane for Slab Stabilization OR 115,478 GAL Asphalt for Slab Stabilization 159,224 LF Highly Reflectorized Temporary Polyurea Pavement Markings 60,253 EA Sonic Nap Alert Patterns (S.N.A.P.) 1,358 EA Delineation Devices

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents