Similar Projects
Hollenbachs Bridge
Demolition, New Construction, Infrastructure
Conception
$2,284,370 CJ est. value
Schnecksville, PA 18078

Hollenbachs Bridge
Demolition, New Construction, Infrastructure
Conception
$2,284,370 CJ est. value
Schnecksville, PA 18078

Powder Valley Road over Indian Creek
Demolition, New Construction, Infrastructure
Design
$993,950 CJ est. value
Zionsville, PA 18092

Powder Valley Road over Indian Creek
Demolition, New Construction, Infrastructure
Design
$993,950 CJ est. value
Zionsville, PA 18092

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Accessible Secondary Entry Project
Infrastructure
Results
Schnecksville, PA 18078

I-78 Pm 2 - Lehigh
Infrastructure
Results
$10,000,000 to $12,499,999 est. value
PA

Whitehall-Coplay School District New Elementary School - General
New Construction, Infrastructure - 95,835 SF
Construction
$22,424,000 CJ est. value
Whitehall, PA 18052

Maulfair Drive Drainage Improvements Project
Infrastructure
Construction
$395,899 CJ est. value
Salisbury Township, PA 18103

Penn Square Section 6
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Allentown, PA 18103

Penn Square Section 6
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Allentown, PA 18103

Limeport Pike over Saucon
Infrastructure
Conception
$3,490,250 CJ est. value
Coopersburg, PA 18036

Kernsville Road Bridge
Infrastructure, Renovation
Design
$3,115,750 CJ est. value
Coplay, PA 18037

Devonshire Road - Mill, Grade and Overlay
Infrastructure
Post-Bid
Allentown, PA 18103

Last Updated 05/23/2023 06:08 PM
Project Title

South Second Street Multimodal Improvements Project

Physical Address View project details and contacts
City, State (County) Emmaus, PA 18049   (Lehigh County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $586,144 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 23, 2023, the project has not been awarded. A timeline for award has not been confirmed. For South Second Street Multimodal Improvements Project Question Deadline 04/18/2023 at 12:00 PM ET The Borough anticipates awarding the project at their borough council meeting on May 1, 2023. The completion date is October 15, 2023 per the MS 944. Each bidder is required to bid on the total project. Each bid must be accompanied by a bid bond or certified check made payable to "Emmaus Borough" in the amount of 10% of the total bid. The successful bidder shall provide a performance bond or certified check to the municipality in the amount of 100% of the contract within 20 days after the contract is awarded. The successful bidder shall provide a payment bond or certified check to the municipality in the amount of 100% of the contract within 20 days after the contract is awarded. Bid security in the amount of 10% of the total bid shall be furnished in accordance with the Instructions to Bidders. Emmaus Borough hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents