Similar Projects
Chandler (1300 Block) Reconstruction - 107.24.02 - City of Danville
Infrastructure
Conception
$400,000 CJ est. value
Danville, IL 61832

Chandler (1300 Block) Reconstruction - 107.24.02 - City of Danville
Infrastructure
Conception
$400,000 CJ est. value
Danville, IL 61832

Z1DA--Project 550-24-201 Replace Campus Sidewalk CON
Infrastructure
Bidding
$1,000,000 CJ est. value
Danville, IL 61834

Z1DA--Project 550-24-201 Replace Campus Sidewalk CON
Infrastructure
Bidding
$1,000,000 CJ est. value
Danville, IL 61834

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

3P Resurfacing Standard Overlay, From US 136(W) to US 150 W of Fithian. Project Length 14.5 Miles
Term Contract
Results
IL

CM (Standard Overlay) Resurfacing From Chicago Ave. to Holloway St. at Bismark
Infrastructure
Results
IL

Concrete Pad with Downspout/ Drainage Tile Work
Infrastructure
Construction
$70,000 CJ est. value
Bismarck, IL 61814

Rebuild Downtown and Mainstreets Project - 107.24.03 - City of Danville
Infrastructure
Conception
$3,000,000 CJ est. value
Danville, IL 61832

Market Street Water Main Replacement
Infrastructure
Bidding
$400,000 CJ est. value
Hoopeston, IL 60942

Construct Parking Lot/Street Lighting GH Area at Illiana VA - Rebid
Infrastructure, Renovation
Post-Bid
$745,000 CJ est. value
Danville, IL 61832

Bridge Repairs to SN 092-9903 and Removal of SN 092-9904 at Kickapoo State Park
Infrastructure
Results
$1,473,747 CJ est. value
Oakwood, IL 61858

Poland Road Sewer Relocations - 402.24.04 - City of Danville
Infrastructure
Conception
$500,000 CJ est. value
Danville, IL 61834

Sidewalk and Miscellaneous Repairs at Illiana
Infrastructure
Post-Bid
$745,000 est. value
Danville, IL 61832

Last Updated 12/19/2023 02:04 PM
Project Title

Resurfacing, Patching and Sidewalks - Williams St

Physical Address View project details and contacts
City, State (County) Danville, IL 61832   (Vermilion County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $1,636,078 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing, patching and sidewalks on Williams Street from Bowman Avenue to State Street in Danville. Region 3 District 5 Federal Project # WYA2(932) County(s) Vermilion Key Route(s) FAU 7003 Marked Route(s) Williams Street Section(s) 22-00368-00-PV (DANVILLE) State Job #(s) C-95-006-23 PPS #(s) 5-10505-0000, 5-10505-0010 Completion Date: 85 Working Days Questions not accepted as of November 07, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 27, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 101 - Resurfacing, Patching and Sidewalks - Williams St

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents