Similar Projects
Well Abandonment Project
Infrastructure
Bidding
Riverside, CA 92519

Well and Pump Maintenance and Repair
Infrastructure
Bidding
$114,000 est. value
Napa, Suisun City, CA 94585

Well and Pump Maintenance and Repair
Infrastructure
Bidding
$114,000 est. value
Napa, Suisun City, CA 94585

Grayson Well 69 (Replacing Well 274)
Infrastructure
Post-Bid
$2,449,000 est. value
Grayson, Modesto, CA 95363

Plumas National Forest Brush Creek Fuel Pump Repair
Term Contract
Bidding
$25,000 to $100,000 est. value
Berry Creek, CA 95916

Drilling and Construction of Well 33 Project
Infrastructure
Bidding
Colton, San Bernardino, CA 92324

Well Pumping Plant 31, Fogg Street
Infrastructure
Bidding
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Drilling of Water Wells North Long Beach 13 and North Long Beach 14
Infrastructure
Bidding
Long Beach, CA 90899

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Martin Slough Flow Enhancement Project
Alteration
Bidding
Eureka, CA 95503

Southern Pump Station Project
Infrastructure
Bidding
$6,200,000 est. value
El Centro, CA 92244

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Bidding
Anaheim, CA

Chilled Water Pump Project
Infrastructure
Bidding
Marysville, CA 95901

CA-Stone Lakes NWR-Pumps Rehab
Term Contract
Post-Bid
Elk Grove, CA

Last Updated 08/25/2021 05:15 PM
Project Title

Treated Water Booster Pumps

Physical Address View project details and contacts
City, State (County) CA   (Sacramento County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Treated Water Booster Pumps: Size 14 DKH, 2 Stage, NSF-61 Certified, Barrel mounted pumps, rated for 2000 GPM at 120 ft. TDH, 1770 RPM, with SS Bowl and Impeller Wear Rings, 0-Rings on Bowl Joints, Galvanized Anti-Vortex Strainer, 10" x 1.25" Product Lube Column Assembly, 12 x 16.5 x 30 Type VF Discharge Head, Chesterton 155 Mechanical Seal, API-13 Seal Flush Piping, and Flanged Adjustable Spacer Coupling. Motors 100 HP, GE, 1800 RPM, 3/60/460 Volt TEFC Motors with space heaters and thermostats. Suction Barrels Pumps to be installed into existing suction barrels. New bolting and head to barrel gaskets to be provided. Coatings Epoxy Coating on Bowl OD, Column ID and OD, and Discharge Head Waterways. Testing Non-Witness Factory Performance Test, each unit. Hydrostatic test on each discharge head.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents