Similar Projects
Morrills Corner - State Route 302 and 100
Alteration
Conception
Portland, ME 04101

MPI DOT Paving Stevens Avenue - City of Portland
Infrastructure
Conception
$450,000 CJ est. value
Portland, ME 04103

Stroudwater Apartments
New Construction, Infrastructure - 45,000 SF
Design
$13,000,000 CJ est. value
Westbrook, ME 04092

Carr Woods
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Cape Elizabeth, ME 04107

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Crack Sealing Services
Term Contract, Infrastructure
Post-Bid
Portland, ME

Repair Pavement Main Entrance South Portland Air National Guard Station (SPANGS)
Infrastructure
Post-Bid
$47,000 est. value
South Portland, ME 04106

Interstate 295 Southbound Over State Route 703 and Interstate 295 Southbound Over Westbrook Street Bridge Joints
Results
Less than $1,677,000 est. value
South Portland, ME 04106

Andrews Square Intersection Improvements
Results
$400,000 est. value
Portland, ME

Stevens Square at Baxter Woods Apartments / Portland
New Construction, Infrastructure
Construction
$60,800,000 CJ est. value
Portland, ME 04103

York Street Mixed-Use Renovation
Renovation, Infrastructure - 9,620 SF
Construction
$5,000,000 CJ est. value
Portland, ME 04101

Summit Community Church
New Construction, Infrastructure - 28,000 SF
Pending Verification
$8,000,000 CJ est. value
Gorham, ME 04038

Cummings Road Cannabis Cultivation Facility
New Construction, Infrastructure - 23,940 SF
Pending Verification
$2,500,000 CJ est. value
South Portland, ME 04106

Fore Street Sewer Separation - City of Portland
Infrastructure
Conception
$2,000,000 CJ est. value
Portland, ME 04101

Last Updated 12/22/2022 11:34 AM
Project Title

Interchange Improvements - Saco

Physical Address View project details and contacts
City, State (County) Portland, ME 04101   (Cumberland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $41,922,810 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of highway, interchange, and toll system construction at Exit 35 in Saco and modifications to the Exit 36 Interchange in Saco. The work includes a new interchange at MM 35, including southbound and northbound ramps, a new southbound toll plaza on the west side of the Maine Turnpike with a signalized intersection at Route 112, a new northbound toll plaza on the east side of the Maine Turnpike with a signalized intersection at Route 112, widening of the southbound Maine Turnpike to construct a separated collector-distributor road, widening of Route 112, and construction of access roads. The work includes earthwork, pavement, concrete, signing, overhead sign structures, concrete barrier, guardrail, drainage, stormwater management, electrical work, highway lighting, lightning suppression systems, and maintenance of traffic. The toll plaza work includes installation of tolling equipment, administration buildings, canopies, and toll booths and all other work incidental thereto in accordance with the Plans and Specifications Bids will be accepted from Contractors prequalified by the Maine Department of Transportation for Highway Construction Projects or Bridge Construction Projects. In addition, Contractors submitting bids must be themselves or utilize a highway subcontractor prequalified by the Maine Department of Transportation, a bridge subcontractor prequalified by the Maine Department of Transportation, a building subcontractor prequalified by the Maine Department of Transportation for Buildings, and an electrical subcontractor prequalified by the Maine Department of Transportation for Traffic Signals and Lighting Projects. All other bids may be rejected. This Project includes a wage determination developed by the State of Maine Department of Labor For general information regarding Bidding and Contracting procedures, contact Nate Carll, Purchasing Manager, at (207) 482-8115. For information regarding Schedule of Items, plan holders list and bid results, visit our website electronically For Project specific information, fax all questions to Nate Carll, Purchasing Manager, at (207) 871-7739 or email ncarll@maineturnpike.com. Responses will not be prepared for questions received by telephone. Bidders shall not contact any other Authority staff or Consultants for clarification of Contract provisions, and the Authority will not be responsible for any interpretations so obtained. Proposals must be accompanied by an original bid bond, certified or cashier's check payable to the Maine Turnpike Authority in an amount not less than Five (5%) Percent of the Total Amount in the Proposal, but not less than $500.00. The Bidder to whom a Contract is awarded will be required to furnish a Surety Corporation Bond, satisfactory to the Authority, on the standard Contract Bond form of the Authority, for a sum not less than the Total Amount of the Proposal. Proposals must be made upon the Proposal Forms furnished by the Authority separately with the Contract Documents, and must be enclosed in the sealed special addressed envelope provided therefore bearing the name and address of the Bidder, the name of the Contract, and the date and time of Proposal opening on the outside. The Authority reserves the unqualified right to reject any or all Proposals and to accept that Proposal which in its sole judgment will under all circumstances serve its best interest. All questions regarding Contract 2022.07 shall be submitted by November 29, 2022 at 12:00 pm. Questions received after that time may not be answered.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents