Similar Projects
Metro Parkway Resurfacing - Mound Road to Ryan Road - City of Sterling Heights
Infrastructure
Conception
$1,200,000 est. value
Sterling Heights, MI 48310

Dobry Drive Resurfacing - Ryan Road East To Crossover
Alteration
Conception
$1,000,000 est. value
Sterling Heights, MI 48310

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

Take 5 Oil Change / Warren
New Construction, Infrastructure - 1,430 SF
Post-Bid
$420,000 CJ est. value
Warren, MI 48093

Center Campus Culvert Replacement
Infrastructure
Post-Bid
Clinton Township, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Transportation Building Site Renovations Project
Infrastructure
Results
Warren, MI 48089

Circle A
Demolition, New Construction, Infrastructure, Renovation - 3,612 SF
Pending Verification
$1,500,000 CJ est. value
Sterling Heights, MI 48310

Circle A
Demolition, New Construction, Infrastructure, Renovation - 3,612 SF
Pending Verification
$1,500,000 CJ est. value
Sterling Heights, MI 48310

15 Mile Road Resurfacing - Van Dyke Avenue to Maple Lane - City of Sterling Heights
Infrastructure
Conception
$1,200,000 est. value
Sterling Heights, MI 48310

Speedway Gas Station and Convenience Store / Shelby Township
New Construction, Infrastructure - 4,608 SF
Design
$1,400,000 CJ est. value
Shelby Township, MI 48317

2022 High School Paving Work
Infrastructure
Post-Bid
Richmond, MI 48062

In-System Storage Devices
Infrastructure, Alteration
Results
Clinton Township, MI

Jefferson Avenue Office
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
St Clr Shores, MI 48080

Last Updated 05/06/2023 05:31 AM
Project Title

Bridge Reconstruction Including Replacement With Precast Box Culvert 24 Foot Span by 9 Foot Rise and Approach Work on Coon Creek Road

Physical Address View project details and contacts
City, State (County) Armada, MI 48005   (Macomb County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $894,903 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge reconstruction including replacement with precast box culvert 24 foot span by 9 foot rise and approach work on Coon Creek Road over Coon Creek, Macomb County. This is a Local Agency project. Net classification required for this project is 1036 Ea or 1036 Fa In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec BFPO 50000 Job No 212276A Federal No 23A0411 MI DOT - 2305 019 - Bridge Reconstruction Including Replacement With Precast Box Culvert 24 Foot Span by 9 Foot Rise and Approach Work on Coon Creek Road

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents