Similar Projects
Buckner Road Townhouses
New Construction, Infrastructure
Conception
$19,600,000 CJ est. value
Thompsons Station, TN 37179

Church Street Infrastructure Improvement - City of Franklin
Infrastructure
Conception
$648,000 CJ est. value
Franklin, TN 37064

Mallory Valley 12 & 24" Mains Contract E
Infrastructure
Design
$1,250,000 CJ est. value
Franklin, TN 37067

West Main Street Commercial Building
New Construction, Infrastructure - 6,500 SF
Design
$2,000,000 CJ est. value
Franklin, TN 37064

Sidewalk Project at Bowie Nature Park Playground
Infrastructure
Bidding
$90,000 CJ est. value
Fairview, TN 37062

Renaissance High School HVAC Replacement and Minor Architectural Renovation
Addition, Demolition, Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Franklin, TN 37064

CVS #6415
New Construction, Infrastructure
Post-Bid
Franklin, TN 37067

CVS #386
New Construction, Infrastructure
Post-Bid
Thompson's Station, TN 37179

Franklin Southeast Basin Pilot Treatment Facility and Redwing Reclaimed Water Pump Station
New Construction
Results
Franklin, TN

Old Hillsboro Road Water Pumping Station
Infrastructure
Results
$6,200,000 est. value
Franklin, TN 37065

Ragsdale Road Improvements - Brentwood
Infrastructure
Pending Verification
$9,600,000 CJ est. value
Brentwood, TN 37027

Mercy Community Healthcare
New Construction, Infrastructure - 33,500 SF
Pending Verification
$19,000,000 CJ est. value
Franklin, TN 37064

Evans Street Sewer Improvements - City of Franklin
Infrastructure
Conception
$452,500 CJ est. value
Franklin, TN 37064

Carothers Stacked Flats
New Construction, Renovation, Infrastructure
Design
$2,500,000 CJ est. value
Franklin, TN 37067

New Classroom Building
New Construction, Infrastructure - 41,750 SF
Post-Bid
$23,600,000 est. value
Franklin, TN 37067

Last Updated 08/25/2022 02:36 PM
Project Title

Water Booster Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Brentwood, TN 37027   (Williamson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing (Kyle Gibson, kgibson@ssr-inc.com) no later than 4:00 pm on August 31, 2022. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Question Submission Deadline:August 31, 2022, 4:00pm Question Response Deadline:September 2, 2022, 4:00pm The project consists of coating repair on miscellaneous steel surfaces and piping in four (4) of the City's water booster pump stations. The booster pump stations included in this project are: 1. Long Street Pump Station - 1307 Longstreet Drive 2. Raintree Pump Station - 1521 Eastwood Drive 3. Split Log Pump Station - 9001 Split Log Road 4. Windstone Pump Station - 802 Windstone Blvd

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents