Similar Projects
2021 Crack Sealing
Post-Bid
MN

2nd Street Utility and Surface Improvements
Post-Bid
Henning, MN 56551

Westwind 4th Addition Street & Utility Improvements
Results
MN

Riverfront Improvements Phase 1
Results
Fergus Falls, MN

North Smoky Hills Graveling
Renovation
Post-Bid

CSAH 35 Full Depth Reclaim, Wear Course, Shouldering
Results
$693,472 est. value
MN

Sanitary Sewer, Storm Sewer, Water Main, Services and Roadway Improvements
Infrastructure
Post-Bid
Fergus Falls, MN 56537

County-wide Pavement Markings
Results
MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

CSAH 35 Reconditioning
Renovation
Results
MN

Downtown Riverfront Improvements Phase 2
Infrastructure
Post-Bid
$500,000 est. value
Fergus Falls, MN

2021 County Wide Seal Coat
Infrastructure
Results
$1,348,856 est. value
MN

2022 Utility and Surface Improvements
Infrastructure
Post-Bid
$240,000 est. value
Henning, MN 56551

CSAH 46 and CSAH 95 Improvements
Infrastructure
Results
Parkers Prairie, MN

2022 Bituminous Mill Overlay Improvement
Infrastructure
Post-Bid
$400,000 est. value
Fergus Falls, MN

Last Updated 07/19/2022 07:45 AM
Project Title

Road and Street Surfacing - 2022 Seal Coat

Physical Address View project details and contacts
City, State (County) MN   (Otter Tail County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Road and Street Surfacing - 2022 Seal Coat Approximate Project Length = 49.356 Miles The project consists of the following approximate quantities: 61 HR Street Sweeper (With Pickup Broom) 808,827 SY of Bituminous Seal Coat 124,002 LF 4" Solid Line Paint 26,823 LF 4" Broken Line Paint 288,222 LF 6" Solid Line Paint 1,200 LF 8" Solid Line Paint 317 LF 24" Solid Line Preformed Tape Ground In 349.02 SF Pavement Message Preformed Tape Ground In 1,224 SF Crosswalk Preformed Tape Ground In Approximate Project Length = 49.356 Miles Minimum Wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Seal Coats, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents