Similar Projects
Defoamant - Kaw Point Treatment Plant
New Construction
Results
Kansas City, KS

On Call Contractor Services for Treatment Plant
Term Contract
Post-Bid
Wichita, KS

Wastewater Treatment Plant Aeration Blower Replacement
Renovation
Results
Wamego, KS

Odor and Corrosion Control Services
New Construction
Post-Bid
Wichita, KS

Operation and Maintenance for Oakland RNG Pipeline
Renovation
Post-Bid
Topeka, KS

SCADA System Maintenance and Integration Services
Term Contract
Post-Bid
Overland Park, KS 66224

Last Updated 12/20/2021 08:58 AM
Project Title

Turkey Creek WWTF Miscellaneous Improvements

Physical Address View project details and contacts
City, State (County) Mission, KS 66202   (Johnson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Work includes replacement of the Primary Clarifier Scum Beach equipment; Influent Diversion Structure Walkway improvements; Grit Vortex Unit gearbox replacement and odor control panel support beam repairs and associated electrical improvements; Unaerated Grit Chamber access stairway and grading work; potable water service including 1,790 feet of 2.5- inch HDPE waterline and required building connection(s), valves, and backflow prevention; Makeup Air Unit (MAU) Replacements for Turkey Creek Buildings 3 and 4 and temporary air handling during construction; Mission Main Building 4 valve and piping replacements including removal and replacement of two 16-inch and two 24- inch butterfly valves, upgrading existing actuators to electric actuators with built in shutdown battery, Mission Main Building 4 walkway improvements, piping replacement and other associated work; hauling of flow from Roe Village Pump Station during Mission Main Building 4 shutdown(s); maintaining treatment plant operations during construction, any required pavement replacement, and any other associated work

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents