Similar Projects
Last Updated | 12/20/2021 08:58 AM |
Project Title | Turkey Creek WWTF Miscellaneous Improvements |
Physical Address | View project details and contacts |
City, State (County) | Mission, KS 66202 (Johnson County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Work includes replacement of the Primary Clarifier Scum Beach equipment; Influent Diversion Structure Walkway improvements; Grit Vortex Unit gearbox replacement and odor control panel support beam repairs and associated electrical improvements; Unaerated Grit Chamber access stairway and grading work; potable water service including 1,790 feet of 2.5- inch HDPE waterline and required building connection(s), valves, and backflow prevention; Makeup Air Unit (MAU) Replacements for Turkey Creek Buildings 3 and 4 and temporary air handling during construction; Mission Main Building 4 valve and piping replacements including removal and replacement of two 16-inch and two 24- inch butterfly valves, upgrading existing actuators to electric actuators with built in shutdown battery, Mission Main Building 4 walkway improvements, piping replacement and other associated work; hauling of flow from Roe Village Pump Station during Mission Main Building 4 shutdown(s); maintaining treatment plant operations during construction, any required pavement replacement, and any other associated work |
||||||||||||||||||
Details | Sewage Treatment Plant, Renovation.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |