Similar Projects
Surfacing/Roadway Restoration Highway:IH410
Bidding
Less than $23,600,072 est. value
TX

Highway Improvement Highway:VA
Bidding
Less than $1,084,790 est. value
TX

2019 Street Maintenance Contract
Post-Bid
China Grove, TX 78263

Ring Road Bent Repairs
Post-Bid
Less than $189,365 est. value
San Antonio, TX

Blanco Road Phase II
Results
$19,200,000 est. value
San Antonio, TX 78207

2019-2020 Microsurface Toc Package 1
Results
$3,000,000 est. value
San Antonio, TX

Widen Road - Add Lanes Highway:SL1604
Bidding
$165,766,591 est. value
TX

Oakwell Farms 2019 Trail Reconstruction
Post-Bid
San Antonio, TX

Southern Region Disaster Recovery Support BPA
Results

Upper Leon Creek-Government Canyon Regional Rswf
Bidding
Less than $7,410,378 est. value
San Antonio, TX 78205

2019 Oakwell Farms Mill and Overlay Phase I
Post-Bid
Less than $420,000 est. value
TX

Repair Stanley Road
Results
$1,000,000 to $5,000,000 est. value
San Antonio, TX 78234

2021-2022 Task Order Contract for Pavement Markings, Package A
Bidding
$3,500,000 est. value
San Antonio, TX

2020 Street Improvements Phase II Eaglecrest Boulevard
Post-Bid
Windcrest, TX 78239

2018 Street Preservation and Maintenance Project
Results
Schertz, TX

Last Updated 05/11/2020 07:40 AM
Project Title

Expand 4 to 6 Lns Divided and Intersect Operations

Physical Address View project details and contacts
City, State (County) TX   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,498,046
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 62.000 1 104 6009 Removing Conc (Riprap) Sy 865.000 2 104 6011 Removing Conc (Medians) Sy 1,014.000 3 104 6015 Removing Conc (Sidewalks) Sy 5,517.000 4 104 6017 Removing Conc (Driveways) Sy 326.000 5 104 6021 Removing Conc (Curb) Lf 13,855.000 6 104 6024 Removing Conc (Retaining Walls) Sy 1.000 7 104 6032 Removing Conc (Wheelchair Ramp) Sy 299.000 8 104 6040 Removing Conc (Pavers) Sy 1,066.000 9 105 6076 Remov Stab Base And Asph Pav (2"-15") Sy 4,712.000 10 110 6001 Excavation (Roadway) Cy 9,213.000 11 132 6005 Embankment (Final)(Ord Comp)(Ty c) Cy 1,188.000 12 161 6017 Compost Manuf Topsoil (4") Sy 23,513.000 13 164 6007 Broadcast Seed (Perm) (Urban) (Clay) Sy 23,513.000 14 164 6009 Broadcast Seed (Temp) (Warm) Sy 23,513.000 15 168 6001 Vegetative Watering Mg 367.000 16 169 6001 Soil Retention Blankets (Cl 1) (Ty a) Sy 23,513.000 17 216 6001 Proof Rolling Hr 106.000 18 354 6022 Plane Asph Conc Pav(0" To 3") Sy 105,150.000 19 401 6001 Flowable Backfill Cy 310.000 20 402 6001 Trench Excavation Protection Lf 505.000 21 416 6029 Drill Shaft (Rdwy Ill Pole) (30 In) Lf 456.000 22 416 6031 Drill Shaft (Trf Sig Pole) (30 In) Lf 12.000 23 416 6032 Drill Shaft (Trf Sig Pole) (36 In) Lf 126.000 24 416 6034 Drill Shaft (Trf Sig Pole) (48 In) Lf 88.000 25 420 6002 Cl a Conc (Misc) Cy 42.000 26 429 6007 Conc Str Repair (Vertical & Overhead) Sf 15.000 27 432 6002 Riprap (Conc)(5 In) Cy 109.000 28 432 6006 Riprap (Conc)(Cl b) Cy 20.000 29 438 6001 Cleaning And Sealing Existing Joints Lf 216.000 30 450 6030 Rail (Ty c221) Lf 260.000 31 450 6103 Rail (Ty Pr11) Lf 130.000 32 462 6078 Conc Box Culv (10 Ft x 10 Ft)(Extend) Lf 142.000 33 464 6005 Rc Pipe (Cl Iii)(24 In) Lf 505.000 34 465 6016 Inlet (Compl)(Pco)(3ft)(Both) Ea 7.000 35 465 6032 Inlet (Compl)(Pcu)(3ft)(Both) Ea 3.000 36 465 6126 Inlet (Compl)(Psl)(Fg)(3ftx3ft-3ftx3ft) Ea 1.000 37 466 6174 Wingwall (Pw - 1) (Hw=13 Ft) Ea 1.000 38 479 6006 Adjusting Inlet (Cap) Ea 6.000 39 496 6002 Remov Str (Inlet) Ea 1.000 40 496 6006 Remov Str (Headwall) Ea 1.000 41 500 6001 Mobilization Ls 1.000 42 502 6001 Barricades, Signs And Traffic Handling Mo 14.000 43 506 6020 Construction Exits (Install) (Ty 1) Sy 448.000 44 506 6024 Construction Exits (Remove) Sy 448.000 45 506 6038 Temp Sedmt Cont Fence (Install) Lf 4,336.000 46 506 6039 Temp Sedmt Cont Fence (Remove) Lf 4,336.000 47 506 6040 Biodeg Erosn Cont Logs (Instl) (8") Lf 858.000 48 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 858.000 49 508 6001 Constructing Detours Sy 173.000 50 512 6001 Port Ctb (Fur & Inst)(Sgl Slope)(Ty 1) Lf 1,440.000 51 512 6009 Port Ctb (Fur & Inst)(Low Prof)(Ty 1) Lf 3,960.000 52 512 6010 Port Ctb (Fur & Inst)(Low Prof)(Ty 2) Lf 240.000 53 512 6025 Port Ctb (Move)(Sgl Slp)(Ty 1) Lf 1,020.000 54 512 6033 Port Ctb (Move)(Low Prof)(Ty 1) Lf 3,840.000 55 512 6034 Port Ctb (Move)(Low Prof)(Ty 2) Lf 680.000 56 512 6049 Port Ctb (Remove)(Sgl Slp)(Ty 1) Lf 1,440.000 57 512 6057 Port Ctb (Remove)(Low Prof)(Ty 1) Lf 3,960.000 58 512 6058 Port Ctb (Remove)(Low Prof)(Ty 2) Lf 240.000 59 528 6004 Landscape Pavers Sy 645.000 60 529 6001 Conc Curb (Ty i) Lf 11,293.000 61 529 6015 Conc Curb (Ty c1) Lf 1,000.000 62 530 6017 Driveways (Conc) (Hes) Sy 252.000 63 531 6001 Conc Sidewalks (4") Sy 2,780.000 64 531 6003 Conc Sidewalks (6") Sy 20.000 65 531 6005 Curb Ramps (Ty 2) Ea 8.000 66 531 6016 Curb Ramps (Ty 21) Ea 4.000 67 531 6017 Curb Ramps (Ty 22) Ea 7.000 68 536 6002 Conc Median Sy 134.000 69 536 6004 Conc Directional Island Sy 95.500 70 545 6003 Crash Cush Atten (Move & Reset) Ea 3.000 71 545 6005 Crash Cush Atten (Remove) Ea 5.000 72 545 6019 Crash Cush Atten (Instl)(s)(n)(Tl3) Ea 5.000 73 610 6007 Remove Rd Il Asm (Shoe-Base) Ea 37.000 74 610 6009 Remove Rd Il Asm (Trans-Base) Ea 6.000 75 610 6214 In Rd Il (Ty Sa) 40t-8 (250w Eq) Led Ea 54.000 76 610 6215 In Rd Il (Ty Sa) 40t-8-8 (250w Eq) Led Ea 3.000 77 618 6023 Condt (Pvc) (Sch 40) (2") Lf 130.000 78 618 6024 Condt (Pvc) (Sch 40) (2") (Bore) Lf 1,320.000 79 618 6029 Condt (Pvc) (Sch 40) (3") Lf 625.000 80 618 6030 Condt (Pvc) (Sch 40) (3") (Bore) Lf 3,020.000 81 618 6046 Condt (Pvc) (Sch 80) (2") Lf 7,683.000 82 618 6047 Condt (Pvc) (Sch 80) (2") (Bore) Lf 1,300.000 83 620 6007 Elec Condr (No.8) Bare Lf 5,070.000 84 620 6009 Elec Condr (No.6) Bare Lf 9,762.000 85 620 6010 Elec Condr (No.6) Insulated Lf 20,380.000 86 621 6005 Tray Cable (4 Condr) (12 Awg) Lf 902.000 87 621 6008 Tray Cable (4 Condr) (14 Awg) Lf 2,182.000 88 624 6002 Ground Box Ty a (122311)w/Apron Ea 18.000 89 624 6010 Ground Box Ty d (162922)w/Apron Ea 16.000 90 624 6028 Remove Ground Box Ea 1.000 91 628 6002 Remove Electrical Services Ea 2.000 92 628 6078 Elc Srv Ty a 240/480 100(Ns)Ss(e)Tp(o) Ea 1.000 93 628 6152 Elc Srv Ty d 120/240 060(Ns)Ss(n)Sp(o) Ea 2.000 94 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(p) Ea 13.000 95 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(t) Ea 41.000 96 644 6033 In Sm Rd Sn Sup&Am Tys80(1)Sa(u) Ea 4.000 97 644 6034 In Sm Rd Sn Sup&Am Tys80(1)Sa(u-1ext) Ea 1.000 98 644 6037 In Sm Rd Sn Sup&Am Tys80(1)Sa(u-Wc) Ea 4.000 99 644 6051 In Sm Rd Sn Sup&Am Tys80(2)Sa(p-Exal) Ea 1.000 100 644 6075 Relocate Sm Rd Sn Sup&Am(Sign Only) Ea 2.000 101 644 6076 Remove Sm Rd Sn Sup&Am Ea 57.000 102 662 6060 Wk Zn Pav Mrk Remov (w)4"(Brk) Lf 12,596.000 103 662 6061 Wk Zn Pav Mrk Remov (w)4"(Dot) Lf 5,196.000 104 662 6063 Wk Zn Pav Mrk Remov (w)4"(Sld) Lf 23,631.000 105 662 6071 Wk Zn Pav Mrk Remov (w)8"(Sld) Lf 17,237.000 106 662 6075 Wk Zn Pav Mrk Remov (w)24"(Sld) Lf 2,061.000 107 662 6080 Wk Zn Pav Mrk Remov (w)(Arrow) Ea 29.000 108 662 6089 Wk Zn Pav Mrk Remov (w)(Uturn Arrow) Ea 4.000 109 662 6090 Wk Zn Pav Mrk Remov (w)(Word) Ea 33.000 110 662 6095 Wk Zn Pav Mrk Remov (y)4"(Sld) Lf 12,407.000 111 662 6098 Wk Zn Pav Mrk Remov (y)6"(Sld) Lf 8,517.000 112 662 6102 Wk Zn Pav Mrk Remov (y)24"(Sld) Lf 138.000 113 666 6006 Refl Pav Mrk Ty i (w)4"(Dot)(100mil) Lf 2,233.000 114 666 6030 Refl Pav Mrk Ty i (w)8"(Dot)(100mil) Lf 180.000 115 666 6036 Refl Pav Mrk Ty i (w)8"(Sld)(100mil) Lf 7,553.000 116 666 6048 Refl Pav Mrk Ty i (w)24"(Sld)(100mil) Lf 2,780.000 117 666 6054 Refl Pav Mrk Ty i (w)(Arrow)(100mil) Ea 49.000 118 666 6063 Refl Pav Mrk Ty i(w)(Uturn Arw)(100mil) Ea 4.000 119 666 6078 Refl Pav Mrk Ty i (w)(Word)(100mil) Ea 54.000 120 666 6105 Refl Pav Mrk Ty i (w)(Bike Arw)(100mil) Ea 41.000 121 666 6111 Refl Pav Mrk Ty i(w)(Bike Syml)(100mil) Ea 42.000 122 666 6156 Refl Pav Mrk Ty i(y)(Med Nose)(100mil) Ea 3.000 123 666 6210 Refl Pav Mrk Ty Ii (y) 6" (Sld) Lf 1,600.000 124 666 6217 Refl Pav Mrk Ty Ii (y) (Med Nose) Ea 3.000 125 666 6224 Pavement Sealer 4" Lf 38,314.000 126 666 6226 Pavement Sealer 8" Lf 7,733.000 127 666 6230 Pavement Sealer 24" Lf 2,780.000 128 666 6231 Pavement Sealer (Arrow) Ea 49.000 129 666 6232 Pavement Sealer (Word) Ea 54.000 130 666 6236 Pavement Sealer (Uturn Arrow) Ea 4.000 131 666 6244 Pavement Sealer (Bike Arrow) Ea 41.000 132 666 6245 Pavement Sealer (Bike Symbol) Ea 42.000 133 666 6300 Re Pm w/Ret Req Ty i (w)4"(Brk)(100mil) Lf 8,730.000 134 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 15,304.000 135 666 6315 Re Pm w/Ret Req Ty i (y)4"(Sld)(100mil) Lf 12,047.000 136 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 240.000 137 672 6010 Refl Pav Mrkr Ty Ii-c-r Ea 1,244.000 138 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 5,426.000 139 677 6003 Elim Ext Pav Mrk & Mrks (8") Lf 14,654.000 140 680 6002 Install Hwy Trf Sig (Isolated) Ea 2.000 141 680 6004 Removing Traffic Signals Ea 3.000 142 680 6011 Install Hwy Trf Sig (Upgrade) Ea 1.000 143 681 6001 Temp Traf Signals Ea 2.000 144 682 6001 Veh Sig Sec (12")Led(Grn) Ea 24.000 145 682 6002 Veh Sig Sec (12")Led(Grn Arw) Ea 15.000 146 682 6003 Veh Sig Sec (12")Led(Yel) Ea 24.000 147 682 6004 Veh Sig Sec (12")Led(Yel Arw) Ea 18.000 148 682 6005 Veh Sig Sec (12")Led(Red) Ea 24.000 149 682 6006 Veh Sig Sec (12")Led(Red Arw) Ea 14.000 150 682 6018 Ped Sig Sec (Led)(Countdown) Ea 30.000 151 682 6023 Back Plate (12")(3 Sec) Ea 33.000 152 682 6024 Back Plate (12")(4 Sec) Ea 5.000 153 684 6035 Trf Sig Cbl (Ty a)(14 Awg)(9 Condr) Lf 13,220.000 154 684 6049 Trf Sig Cbl (Ty a)(16 Awg)(3 Condr) Lf 6,510.000 155 686 6024 Ins Trf Sig Pl Am(s)1 Arm(20')Lum&Ilsn Ea 1.000 156 686 6041 Ins Trf Sig Pl Am(s)1 Arm(40') Ea 1.000 157 686 6044 Ins Trf Sig Pl Am(s)1 Arm(40')Lum&Ilsn Ea 1.000 158 686 6046 Ins Trf Sig Pl Am(s)1 Arm(44')Ilsn Ea 1.000 159 686 6049 Ins Trf Sig Pl Am(s)1 Arm(48') Ea 3.000 160 686 6050 Ins Trf Sig Pl Am(s)1 Arm(48')Ilsn Ea 2.000 161 686 6052 Ins Trf Sig Pl Am(s)1 Arm(48')Lum&Ilsn Ea 1.000 162 686 6057 Ins Trf Sig Pl Am(s)1 Arm(55') Ea 1.000 163 686 6060 Ins Trf Sig Pl Am(s)1 Arm(55')Lum&Ilsn Ea 1.000 164 686 6066 Ins Trf Sig Pl Am(s)1 Arm(65')Ilsn Ea 2.000 165 687 6001 Ped Pole Assembly Ea 15.000 166 688 6001 Ped Detect Push Button (Aps) Ea 30.000 167 688 6003 Ped Detector Controller Unit Ea 3.000 168 690 6086 Remove Vid Image Veh Det Sys (Vivds) Ea 6.000 169 778 6001 Concrete Rail Repair (In-Kind) Lf 30.000 170 3076 6001 d-Gr Hma Ty-b Pg64-22 Ton 6,844.000 171 3076 6042 d-Gr Hma Ty-d Sac-b Pg70-22 Ton 1,355.000 172 3077 6066 Sp Mixes Sp-d Sac-b Pg76-22 Ton 9,100.000 173 3085 6001 Underseal Course Gal 21,085.000 174 6004 6031 Its Com Cbl (Ethernet) Lf 1,109.000 175 6027 6003 Conduit (Prepare) Lf 225.000 176 6027 6008 Ground Box (Prepare) Ea 5.000 177 6058 6001 Bbu System (External Batt Cabinet) Ea 3.000 178 6185 6002 Tma (Stationary) Day 16.000 179 6185 6005 Tma (Mobile Operation) Day 94.000 180 6292 6001 Rvds(Presence Detection Only) Ea 13.000 181 6292 6002 Rvds(Advance Detection Only) Ea 10.000 182 7186 6003 Ngp (Main) (6" Plastic w/Tw) (Open Cut) Lf 78.000 183 7194 6001 San Swr Trench Excavation Protection Lf 40.000 184 7194 6018 Existing Manhole Adjustments Ea 2.000 185 7194 6031 Concrete Cap Cy 8.000 186 7194 6032 San Swr Split Steel Casing (24") Lf 20.000 187 7196 6001 Trench Excavation Protection Lf 382.000 188 7196 6002 Ductile Iron Fittings Ton 5.600 189 7196 6003 Hydrostatic Pressure Test Ea 2.000 190 7196 6004 Temporary Blow-Off(Complete)(2") Ea 2.000 191 7196 6005 Flowable Fill Backfill Cy 548.000 192 7196 6011 Adjust Valve Box Ea 1.000 193 7196 6018 Ductile Iron Pipe (16") Lf 194.000 194 7196 6031 New Meter Box Ea 1.000 195 7196 6032 Fire Hydrant Assembly Ea 1.000 196 7196 6035 Tie-In (Complete)(16") Ea 2.000 197 7196 6041 Reloc Exist Meter And Exist Meter Box Ea 1.000 198 7196 6051 Steel Casing (30")(Open Cut) Lf 16.000 199 7196 6056 Steel Casing (30") (Bore) Lf 309.000 200 7196 6058 Wtr(Jack, Bore, Or Tunnel)(30") Lf 309.000 201 7196 6059 Air Release Valve (Complete)(2") Ea 1.000 202 7196 6060 Wtr (Jack, Bore Or Tunnel) (42") Lf 331.000 203 7196 6061 Carrier Pipe (In Casing) (Di) (16") Lf 309.000 204 7196 6062 Carrier Pipe (In Casing) (Di) (24") Lf 331.000 205 7196 6063 Carrier Pipe (Open Cut) (Di) (16") Lf 16.000 206 7196 6064 Steel Casing (42") (Bore) Lf 331.000 207 7196 6065 Grout Abandonment Water Main (16") Lf 449.000 208 7196 6066 Temporary Blow-Off (Complete)(4 In) Ea 2.000 209 7196 6067 Tie-In (Complete)(20 In) Ea 2.000 210 7196 6068 Adjust Meter Box Ea 1.000 211 7196 6069 20" Ductile Iron Pipe Lf 40.000 212 7196 6070 24" Ductile Iron Pipe Lf 85.000 213 7196 6071 Cut And Replace Asphalt Pavement Sy 142.000 214

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents