Similar Projects
Retainer Contracts for Asphalt Paving, Sealing & Striping Services Statewide
Term Contract
Bidding

2021 Paving
Bidding
Springfield, VT

Cavendish-Weathersfield ER STP 0146 (14)
Results
$500,000 to $1,000,000 est. value
Cavendish, Weathersfield, VT 05142

2020 Paved Highway Rehabilitation
Results
$1,400,000 est. value
Sharon, VT 05065

Replace Asphalt Pavement, North Hartland Lake, North Hartland, VT
Results
North Hartland, VT

Hartford Roundabouts and Sidewalk
Results
$5,000,000 to $10,000,000 est. value
Hartford, VT 05001

Commonwealth Avenue Paving Project
Results
Ludlow, VT 05149

Route 35 Improvements Phase 3
Results
$206,245 est. value
Chester, VT 05143

Windsor-Hartland STP FPAV (31)
Term Contract
Results
$2,500,000 to $5,000,000 est. value
Hartland, Windsor, VT 05089

Sharon-Bethel IM 089-1 (66)
Term Contract
Results
$5,000,000 to $10,000,000 est. value
Bethel, Sharon, VT 05065

South Main Street Utility and Roadway Improvements Project
Results
$2,560,000 est. value
Hartford, VT

Statewide STP Crak (40)
Results
$500,000 to $1,000,000 est. value

Statewide STP Crak (39)
Results
$500,000 to $1,000,000 est. value

2020 Crack Sealing
Results
Sharon, VT

Pleasant and Terrace Street Roadway Rehabilitation and Elm, Crystal and Hall Street Complete Roadway and Utility Reconstruction Project
Results
Windsor, VT

Last Updated 02/25/2020 08:22 AM
Project Title

Pomfret Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) Pomfret, VT   (Windsor County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $690,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of paved highway rehabilitation for approximately 1.7 miles of existing paved roads in Pomfret as outlined in the bid section of these contract documents. Work includes reclaiming, adding road stabilization fabric and dense graded gravel, removing and replacing guardrails, shoulders, and pavement. Work also includes the replacement of eighteen mainline culverts and three side line culverts. Final completion date for the culverts shall be May 22, 2020. All remaining work shall commence on June 1, 2020. All work shall be completed by August 15, 2020.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents