Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

ERSC MATOC
Bidding
$100,000 to $90,000,000 est. value

USCG National Multiple Award Construction Contract (NMACC III)
New Construction, Renovation, Addition
Bidding

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Post-Bid
Less than $95,000,000 est. value

Sources Sought Notice for Design-Bid-Build (DBB), Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Facilities in the North Area of Responsibility (AOR)
Post-Bid

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

USACE Philadelphia District Multi-State Multiple Award Task Order Contract (MATOC) for Facilities Sustainment, Restoration & Modern and Minor Construction
Post-Bid
$5,000 to $4,000,000 est. value

Job Order Contracts (JOC) Region B
New Construction, Renovation
Results
$10,000,000 est. value

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Design
$250,000 to $5,000,000 est. value

D/B Northeast MATOC
Post-Bid
$1,000,000 to $250,000,000 est. value

Northwestern Region Job Order Contracting Services
Term Contract
Results

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Last Updated 04/30/2021 01:06 PM
Project Title

Forker Laboratory Building Renovation

Physical Address View project details and contacts
City, State (County) Sharon, PA 16146   (Mercer County)
Category(s) Government/Public, Laboratory
Sub-Category(s) Laboratory, Misc. Buildings
Contracting Method
Project Status Construction Nearing Completion, Construction Completion Expected May 2021
Bids Due View project details and contacts
Estimated Value $7,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The goal of the project include the following: 1. laboratory Spaces 2. 2nd Floor Faculty Offices 3. Restroom Renovations 4. Mechanical System Upgrades Project includes update to current laboratories in Forker Building. Proposed renovations also include classroom spaces, student spaces, relocation of restrooms, updating and addition of office space and upgrading mechanical systems. The south wing of the building has not been renovated since the original construction in 1968. It has issues with freezing water pipes located above the insulated ceilings and does not have a cooling system. A new boiler was installed in 2016.

Details

1 Laboratory, 27,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents