Similar Projects
Lake George Island Campground - Seasonal Dock Installation/Removal
Term Contract
Bidding
NY

Removal of a Pier/ Platform
Post-Bid
Kauneonga Lake, NY 12749

Lehigh Cement Dock Repairs - CO 109 03RED03
Post-Bid
Oswego, NY 13126

Miscellaneous Structure and Outfitting Improvements
Renovation
Results
$100,000 to $250,000 est. value
Dresden, NY

Boat Launch Reconstruction
Results
Willsboro, NY 12996

Battery Coastal Resilience Project
Renovation
Pending Verification
New York, NY 10012

Kayak Launch at Ontario Beach Park
Post-Bid
Canandaigua, NY 14424

Rehabilitate Fish Ladder and Viewing Platform - Salmon River Fish Hatchery
Results
$3,000,000 to $4,000,000 est. value
Altmar, NY 13302

Niagara River and Ellicott Creek Riverfront Access and Docks Improvement
Term Contract
Post-Bid
Tonawanda, NY 14150

Replace Deteriorating Dock System at Cedar Point State Park
Results
Less than $540,222 est. value
Clayton, NY 13624

Fabrication of Warning Buoys
Post-Bid
Massena, NY 13662

Replace Deteriorating Dock System at Mary Island State Park
Results
Less than $252,194 est. value
Alexandria Bay, NY

Champlin Beach Infrastructure Improvements
Post-Bid
Hammondsport, NY 14840

Wilson Boat Docks Improvement Phase 2
Results
Wilson, NY 14172

Removal of Concrete Floating Docks
Post-Bid
Buffalo, NY

Last Updated 12/10/2021 08:33 AM
Project Title

Restoration of East Terminal Wharf

Physical Address View project details and contacts
City, State (County) Oswego, NY 13126   (Oswego County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will involve the restoration of the East Terminal Wharf. This work will occur within the Port of Oswego Operating area adjacent to Lake Ontario and the Oswego River. Restoration of East Terminal Pier Construction for the Restoration of the East Terminal Wharf will consist of the installation of 90 LF of anchored steel sheeting to repair the existing cellular steel sheeting, replacement of the concrete cap, railroad track replacement, and asphalt resurfacing along the East Terminal Wharf. The operating dock in this area of the rail corridor is in disrepair due to the recent high water and waves. This work will be undertaken to reestablish, maintain, and protect this portion of the East Terminal Wharf.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents