Similar Projects
FM 110 - Construct New Road
Infrastructure
Bidding
$36,738,858 est. value
TX

Plum Creek Marketplace Avenue Phase 2 - Water, Wastewater, Drainage, and Paving Facilities
Post-Bid
TX

Road Improvements: Hot Mix Overlay
Post-Bid
San Marcos, TX 78666

Southern Region Disaster Recovery Support BPA
Results

Highway Improvement
Results
Less than $3,657,186 est. value
TX

Driftwood Club Core Phases 1 and 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Cotton Gin Road Improvements - Phase 1
Results
San Marcos, TX 78666

Driftwood Phase 1 Section 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Freeway Operational Improvements
Results
Less than $13,478,457 est. value
TX

Old Fitzhugh Road Project
Post-Bid
$4,400,000 to $4,800,000 est. value
Dripping Springs, TX 78620

Crack Seal of Asphalt Pavement
Results
Less than $241,524 est. value
TX

SH 130 - Cherryville Parkway / CR 110 Improvements
Post-Bid
$700,000 est. value
Buda, TX

E Hopkins Pedestrian & Bike Improvements (Hopkins from CM Allen to Thorpe)
Results
Less than $1,750,000 est. value
San Marcos, TX 78666

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Road Improvements Remove and Replace Hot Mix
Results
Less than $1,761,155 est. value
San Marcos, TX 78666

Last Updated 10/25/2021 07:36 AM
Project Title

Northern Walnut Creek Hike and Bike Trail Phase 2

Physical Address View project details and contacts
City, State (County) Austin, TX 78750   (Hays County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,900,230
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of approximately 7,017 linear feet of 12’ wide concrete hike and bike trail, including 2 pedestrian bridges and 5 elevated boardwalks from the existing trailhead at Walnut Creek Municipal Park to Cedarbrook Ct. The project also includes traffic controls, signing and pavement markings, erosion and sedimentation controls. African American 2.57%, Hispanic American 6.03% Native/Asian American0.45%

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents