Similar Projects
Construction of Diamante Well
Infrastructure
Bidding
Daphne, AL

Pintlala Water System - Deep Water Production Well and Meter Reading System Replacement
Alteration
Bidding
Hope Hull, AL

Contract 1 - Test Well and Gravel Filter Finish Production Well (Well No. 6 - Red Springs Well)
Post-Bid
Gilbertown, AL

Lott Road Well and Snow Road Well Replacement
Post-Bid
Citronelle, AL 36522

Consecutive Replacement of Wells #1 and #8
Results
Fairhope, AL 36533

Well Abandonment Services for Iron Well on South Ingleside Street
Results
Less than $34,000 est. value
Fairhope, AL 36532

Replacement of Wells 2 and 9
Infrastructure
Bidding
Fairhope, AL 36532

New Water Supply Well on Pea Ridge Road in Association with Provalus
Post-Bid
Less than $1,200,000 est. value
Brewton, AL 36426

Primary Solids Handling Pump Modifications for Hilliard Fletcher Wastewater Treatment Plant
Results
Less than $576,836 est. value
Tuscaloosa, AL

Water Supply Improvements (Contract B)
Post-Bid
Irvington, AL 36544

Rehabilitation of Shellfield Road Well No. 11
Results
Less than $73,140 est. value
Enterprise, AL

Diagnose/Repair- Molnar/Houston/Upland
Post-Bid
Eufaula, AL 36027

Alexander City Adams WTP Vertical Turbine High Service Pump
Results
Alexander City, AL

Sewer Lift Station Motor/Valve Repairs - O`Rourke Elementary School
Post-Bid
Mobile, AL 36695

Double Diaphragm Pump
Results
Less than $33,500 est. value
Orange Beach, AL 36561

Reported 07/14/2021 12:00 AM
Project Title

Replace Water Supply Well - 1 (Contract C)

Physical Address View project details and contacts
City, State (County) Axis, AL   (Mobile County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the abandonment of existing Well #1 and site demolition, construction of a new finish Water Supply Well #1, yard piping, and other necessary improvements. Work also includes the installation of a new diesel generator at Well #2. The proposal includes an additive alternate bid for a test hole, test well, water quality testing, and for removing and upsize the well discharge piping.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Diesel-Engine-Driven Generator Sets.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents