Similar Projects
Sophomore Village at Cornell University
New Construction - 359,600 SF
Construction
$200,000,000 est. value
Ithaca, NY 14850

Freshman Village at Cornell University
New Construction - 1,203,600 SF
Construction
$200,000,000 est. value
Ithaca, NY 14850

Bundy Dorms Toilet Room Alteration
Renovation
Construction
Clinton, NY 13323

Colony Manor Student Housing
New Construction - 445,000 SF
Construction
$60,000,000 est. value
Rochester, NY 14623

Saint Thomas Aquinas Dormitory
Addition - 6,500 SF
Design
Sparkill, NY 10976

People with Developmental Disabilities Western New York DDSO Hostel 8679 Roof Replacement and Bathroom Renovation
Renovation
Results
$275,000 to $334,000 est. value
Little Valley, NY 14755

Camp Na'Aleh Dormitories
New Construction
Conception
Livingston Manor, NY 12758

Cadet Barracks Upgrade Program Bldg 740
Post-Bid
$45,000,000 to $55,000,000 est. value
West Point, NY 10996

Phi Gamma Delta (118 Mcgraw Place) The Oaks 21 East Wing Improvements
Renovation - 1,507 SF
Construction
$375,000 to $400,000 est. value
Ithaca, NY 14850

Project Labor Agreement (PLA) Market Research for Repair Building 740 and Repair Building 738
Renovation - 185,413 SF
Post-Bid
$50,000,000 to $100,000,000 est. value
West Point, NY

Reported 05/12/2020 12:00 AM
Project Title

Sources Sought Notice for Bldg 620 Whole Building Repair Project, United States Military Academy, West Point, NY

Physical Address View project details and contacts
City, State (County) West Point, NY 10996   (Orange County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK: Building 620 was built in 1908 and is used as an existing dormitory. The building is showing signs of age. Major building systems and components are failing due to their age and deterioration from continual use. Various retrofit repairs have been made in the past, but the facility lacks the means to support modern living standards. The building’s essential elements are in need of repair to prevent further failure, continued deterioration, and avoid potential future hazards. The project entails the full renovation of the unaccompanied personnel housing (UPH) Barracks, building 620, and its supporting facilities including surrounding paving, landscape, and utilities infrastructure tie-ins. The current barracks facility has 75 Barracks Rooms and an administrative wing totaling 5,959 Gross Square Feet (GSF). The entire building is 54,237 GSF. Building interior improvements shall replace sub- standard design, life/safety, and energy conservation issues that are no longer comply with current industry standards and accommodate modern living conditions. Improvements shall also entail the replacement of furnishings and finishes to address the deteriorating condition of furniture; interior walls and insulation; doors and door hardware; interior wall finishes; finish floors coverings; ceiling height and materials; toilet room finishes and fixtures. Building exterior renovations shall address failing and or deteriorating systems including water infiltration repairs; partial structural roof system replacement at flat roof; new roofing insulation and waterproofing at flat roof portion of building; new roof metal work including gutters and flashing at slate roof; repair slate roof; window replacement; repair of exterior wall. Hazardous building material such as asbestos, lead, and radon may exist and shall be abated. Mildew and mold that has formed due to water infiltration or improper ventilation shall also be abated. All renovation to correct building failures shall impact only non-historic components or systems. Coordination with SHPO and local historic preservation agencies as well as observance of preservation policies shall be observed. Mechanical/Electrical/Plumbing (MEP) improvements shall correct failures and aging systems through complete replacement including: fire suppression and water supply systems; fire alarm and mass notification system; fire detection, protection, monitoring, and controls; heating and ventilation systems; plumbing systems; electrical systems; telecommunication and cabling systems; security closed circuit television (CCTV); access control card access systems; public address systems; time clock systems; cable television systems; and distributed antenna systems (DAS). Supporting facility improvements shall address utility infrastructure, hardscape and landscape features, and site security features within the project site limits. These include replacement of all deteriorated and/or under-capacity lateral utility lines including domestic water, fire protection water, heating hot water, sewer, natural gas, electrical and storm sewer systems back to main shutoff valve, manhole, and pad mounted transformer; the replacement of all walkways, replacement of damaged trees, shrubs, groundcover, and lawn; replacement of damaged curbing, steps, ramps, railings, and other hardscape features; installation of new tree-well grates, benches, trash receptacles, and removable bollards (if necessary).

Details

1 Dormitory, Approximately 54,237 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents