Similar Projects
Scattered Site Bathroom Renovations
Renovation
Design
$200,000 CJ est. value
Louisville, KY 40272

Upgrade Life Safety Bid Package #1 KCTCS- Somerset Community & Technical College
Renovation
Bidding
$898,300 CJ est. value
Somerset, KY 42501

Phase A: Bathroom Upgrades
Renovation
Bidding
$147,000 CJ est. value
Winchester, KY 40391

Synthetic Turf Fields
Infrastructure
Post-Bid
Barbourville, Corbin, KY 40701

Central Parking Garage Restoration
Renovation, Infrastructure, Alteration
Post-Bid
Lexington, KY 40507

Second Street Streetscape
Infrastructure, Alteration
Results
Pikeville, KY 41501

Renovation to the Robert Cherry Civic Cener
Renovation - 9,300 SF
Results
$1,365,799 CJ est. value
Paducah, KY 42001

MS 539 Egress Corridor
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Lexington, KY 40508

Concrete for the Kenton County Public Works
Term Contract, Alteration
Post-Bid
Covington, KY

Flowable Fill and Concrete
Alteration
Results
Erlanger, KY

New Warren Elementary School Bid Group 2 - Building Package
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Bowling Green, KY 42101

Job Order Contract For Concrete/Sidewalk Contractors
Term Contract, Alteration
Post-Bid
Bowling Green, KY

Concrete Street Improvements
Infrastructure, Alteration
Results
Edgewood, KY 41017

EEC-AML-Roger Cornett Slide Phase II-BIL
Infrastructure
Bidding
$390,000 CJ est. value
Hazard, KY 41719

BCPWD 22/23-06 Concrete
Term Contract, Alteration
Post-Bid
Burlington, KY

Last Updated 08/08/2023 09:27 PM
Project Title

Mayfield Electric & Water Systems Buildings 200-600

Physical Address View project details and contacts
City, State (County) Mayfield, KY 42066   (Graves County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $730,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Mayfield Electric & Water Systems (Owner) Will Receive Proposals Through Codell Construction Company (Construction Manager as Contractor) to Furnish All Labor and Materials to Complete the Following Buildings: Water District Warehouse (200) - Compressor Drive, Internet Warehouse (300) - Beech Street, Electric Service Warehouse (400a and 400b) - South 16th Street, Water Lab Building (500) - South 12th Street, Centrifuge Building (600a) - 1100 East Houseman, Sewer Services Building (600b) - 1100 East Houseman, Belt Press Building (600c) - 1100 East Houseman Located in Mayfield, Ky 42066. Work is to Be Performed in Accordance With Plans, Specifications, and Addenda Prepared by Jks Architects (Architect), Marcum Engineering (M/e Engineer), K&s Engineering (Structural Engineer) Each bid must be accompanied by a 5% Bid Bond. The bid will be submitted in duplicate on copies of the Form of Proposal located in the Volume One Project Manual Bidding and Contract Documents. Both copies of the Form of Proposal and Bid Bond shall be placed in a manila envelope and have the Project Name and Proposed Bid Package number affixed. No Bidder may withdraw a bid submitted for a period of sixty (60) days after the date set for the opening of bids. Document Acquisition: Made payable to Paducah Blueprint Electronic Copy: Electronic copies are available for $100.00 Non Refundable made payable to Paducah Blueprint. All questions regarding this project must be submitted via e-mail to the Construction Manager (cmiller@codellconstruction.com). The deadline for questions is the close of business August 7, 2023. The Project Schedule will be issued via addendum. The contract will include liquidated damages assessed at $1,000.00/day if the completion date is not met. Successful Bidders are required to furnish a 100% Performance and Labor and Material Payment Bond for this Project. Mayfield Electric & Water Systems and Codell Construction Company reserve the right to reject any or all bids and to waive all informalities and/or technicalities where the best interest can be served. Bids shall be awarded based upon Best Value Criteria included in Section 00200 of the bidding documents. Contracts shall be awarded to the responsive and responsible bidders. Contracts shall be executed between the bidder and Codell Construction Company, the Construction Manager As Contractor. Bids from Small Business Enterprises (SBE, MBE, WBE, VOSB, Etc.) are encouraged and supported.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents