Similar Projects
Z1DA--528A7-17-732 Renovate 5A for Rehabilitation Unit
Renovation
Design
$1,000,000 to $5,000,000 est. value
Syracuse, NY 13210

Valley View Center for Nursing Care Addition
Addition
Design
Greenvale, NY 11548

Cayuga Addiction Recovery Services Expansion
New Construction - 15,670 SF
Post-Bid
Trumansburg, NY 14886

Addiction Care Center
Renovation - 6,870 SF
Post-Bid
$1,250,000 est. value
Queensbury, NY 12804

Rehabilitate North Side Elevators, 1st Floor at Central NY Psychiatric Center
Results
$50,000 to $2,000,000 est. value
Marcy, NY

New York State Office of Mental Health, St. Lawrence Psychiatric Center, Building 203 Boiler Decentralization and Hazardous Materials Removals
Results
$1,100,000 to $1,400,000 est. value
Ogdensburg, NY 13669

Hannick Hall
Renovation, Addition - 26,000 SF
Construction
$4,000,000 est. value
Newark, NY 14513

Robert R Reiss Community Services Center
Renovation, Demolition - 8,000 SF
Construction
$3,000,000 est. value
Saranac Lake, NY 12983

Renovation for Alcohol and Drug Council of Tompkins County Project
Renovation - 18,808 SF
Post-Bid
Ithaca, NY 14850

Z1da--528A7-18-739 Covid-19: Renovate 8th Floor CLC
- 21,000 SF
Results
Syracuse, NY

2nd Floor Conversion
Renovation - 10,000 SF
Construction
$900,000 est. value
Buffalo, NY 14214

UHB - Showers for Nurses Station 32
New Construction
Post-Bid
Brooklyn, NY

John L. Norris Addiction Treatment Center Phase VI Bedroom Renovations and Hazardous Materials
Results
Rochester, NY 14620

Rose Hill - Saint Joseph's Addiction and Recovery Center
Renovation - 18,000 SF
Construction
Massena, NY 13662

Senior Citizen Home Improvement
Renovation, Term Contract
Post-Bid
Hempstead, NY

Last Updated 02/10/2022 12:19 PM
Project Title

Central New York Psychiatric Center, Buildings 39 and 77 Alterations and Hazardous Materials Abatement

Physical Address View project details and contacts
City, State (County) Marcy, NY 13403   (Oneida County)
Category(s) Medical
Sub-Category(s) Nursing/Rehabilitation Center
Contracting Method
Project Status Construction Commenced August 2021, Construction Completion Expected October 2023, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of installation of new boilers, chiller, pumps, and system equipment in Building #180; installation of new chilled water and heating water distribution system between Building #180 and #39; renovation of Building #39 Medical Suite, Pharmacy and Kitchen; renovation of Building #77; Electrical Power, Lighting, Data, Security upgrades; HVAC replacement; selective demolition, asbestos & PCB abatement.

Details

Nursing/Rehabilitation Center, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents