Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ Design - Architect/Engineering Services for the Design of CDC/NIOSH Consolidated Cincinnati Research Facilities, Cincinnati, OH
Demolition, New Construction, Infrastructure - 235,000 SF
Design
$100,000,000 CJ est. value
Cincinnati, OH 45206

PA 764 - 17th St to Pleasant Valley
Infrastructure, Alteration
Design
$2,399,483 est. value
Altoona, PA 16602

South Poplar Run Bridge
Infrastructure
Bidding
$2,500,000 CJ est. value
Claysburg, PA 16625

Stormwater Improvements Walnut and Oak Avenues
Infrastructure
Bidding
$700,000 CJ est. value
Altoona, PA 16601

Fort Roberdeau Site Improvements Project
Infrastructure
Post-Bid
Tyrone, PA

Construction of the Replace Water Main at Gillans Run
Infrastructure
Post-Bid
Duncansville, PA

Old Frankstown Road Sewer Line Extension Project
Infrastructure
Results
Hollidaysburg, PA 16648

Leopold Park Improvements - Site
Infrastructure
Results
$800,000 est. value
Altoona, PA 16601

PA 36 Mill Run Bridge
Infrastructure, Renovation
Design
$2,185,454 CJ est. value
Hollidaysburg, PA 16648

East 5th Street Waterline Replacement Project
Infrastructure
Post-Bid
Bellwood, PA 16617

Everett Road Water Meter Supply
Infrastructure
Results
East Freedom, PA

Frankstown Road to Mill Run Road
Infrastructure
Design
$2,427,067 CJ est. value
Altoona, PA 16602

Everett Road Water and Sanitary Sewer Project
Infrastructure
Post-Bid
East Freedom, PA 16637

2022 Capital Improvements: Applewood Phase I Sewer Replacement and Wye Switches Waterline Replacement
Infrastructure
Results
$154,210 CJ est. value
Juniata Township, PA 16635

Last Updated 08/12/2022 11:32 AM
Project Title

20th to 23rd Avenue Drainage Improvements Project

Physical Address View project details and contacts
City, State (County) Altoona, PA 16601   (Blair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $630,128 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 1, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** 20th to 23rd Avenue Drainage Improvements Project Either an original Certified Check, Official Check, Cashier's Check, or Bid Bond drawn to the order of the "City of Altoona" equal to ten (10%) percent of the amount of the bid must be submitted with the proposal. Note that the Bid Bond must be in effect for a period of sixty (60) days from the bid opening date. Work performed on this project will be subject to prevailing wage rates as established by the Pennsylvania Department of Labor and Industry. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. Mayor and City Council reserve the right to reject any or all bids and waive any informality not material to the bid and to award the contract as may be deemed to the best interest of the City of Altoona. complete the entire contract within ONE HUNDRED TWENTY (120) consecutive calendar days from the date of Notice to Proceed

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents