Similar Projects
US-270B - Grade, Drain and Surface
Infrastructure
Design
$15,000,000 CJ est. value
Shawnee, OK 74801

US 270 - Grade,Drain,Bridge and Surface
Infrastructure, Renovation
Design
$4,000,000 CJ est. value
Shawnee, OK 74801

Absentee Shawnee Police Safety Center
Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Shawnee, OK 74801

Citizen Potawatomi Nation Firelake Casino
New Construction, Infrastructure
Bidding
$30,000,000 CJ est. value
Shawnee, OK 74801

Absentee Shawnee Police Safety Center
New Construction, Infrastructure - 5,581 SF
Post-Bid
$2,000,000 CJ est. value
Shawnee, OK 74801

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Cammack Street Gravity Relief Line
Demolition, Infrastructure
Results
$626,331 CJ est. value
Shawnee, OK 74804

8" Waterline Extension to Cross the North Canadian River
Infrastructure
Results
$448,603 CJ est. value
Shawnee, OK 74801

North Broadway Carwash
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Tecumseh, OK 74873

Shawnee Marketplace, Phase 2
New Construction, Infrastructure - 41,287 SF
Pending Verification
$11,000,000 CJ est. value
Shawnee, OK 74804

Grade, Drain, Bridge and Surface - I 40
Infrastructure
Design
$20,500,000 CJ est. value
Tecumseh, OK 74873

Tidal Wave Car Wash / Shawnee
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Shawnee, OK 74804

CPN Grand to Blackberry Frontage Road
Infrastructure
Post-Bid
$900,000 CJ est. value
Shawnee, OK 74801

Bridge Repair - I-40
Infrastructure
Results
$12,482,685 CJ est. value
Shawnee, OK 74804

Utilities - SH 102
Infrastructure
Design
$420,000 CJ est. value
Tecumseh, OK 74873

Last Updated 05/15/2023 09:08 AM
Project Title

Citizen Potawatomi Nation Hotel

Physical Address View project details and contacts
City, State (County) Shawnee, OK 74801   (Pottawatomie County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $19,200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Guernsey: OK70466004 Project no. 2230-0680 Construction of new 63,425 GSF three story hotel with 126 guest rooms. Contractor should be aware and seek more information regarding a project to widen Hardesty Road since this will have an impact on access to the site. Contractor must coordinate all construction activities and deliveries with the Owner. Bidders will be required to provide Bid security in the form of a Bid Bond of a sum no less than 5 percent of the Bid Amount. Notice to Proceed: Within 30 days of Bid Award date. The Owner reserves the right to change the schedule or terminate the entire procurement process at any time.

Details

3 Stories Above Grade, 63,425 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents