Similar Projects
Soldier's Creek Overflow Parking Lot
Infrastructure
Post-Bid
$462,168 est. value
Longwood, FL 32750

3rd Street Water Main Crossing at US 17-92 and SR 46 Force Main Extension
Infrastructure
Post-Bid
$1,200,000 est. value
Sanford, FL

WTP No. 1 HSPS Suction Piping Replacement
Results
Less than $988,000 est. value
Winter Springs, FL 32708

Country Club Subdivision Sidewalk Improvements
Results
Less than $430,000 est. value
Sanford, FL 32771

Druid Hills Water Main Distribution Upgrades
Results
Less than $2,113,305 est. value
Altamonte Springs, FL 32751

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Backflow Testing and Repair Services
Results
FL

Fire Hydrant Maintenance, Repair and Replacement Services
Results
Sanford, FL

Sand Lake Road at West Lake Brantley Road Improvements
Infrastructure
Results
$99,761 est. value
FL

Advanced Metering Infrastructure (AMI) System
Infrastructure
Results
Sanford, FL

City Hall Complex Parking Lot Repair and Sealcoat
Infrastructure
Results
$29,500 est. value
Altamonte Springs, FL 32701

Sunshine Park Decorative Perimeter Sidewalk Pavers
Infrastructure
Results
$22,000 est. value
Altamonte Springs, FL 32701

Sanlando Sidewalk Phase 2
Infrastructure
Results
$1,526,242 est. value
Sanford, FL 32771

Cross Seminole Trail Phases I and II
Infrastructure
Results
$1,102,400 est. value
Longwood, FL 32750

EE Williamson Road Trail Connection and Intersection Improvements at Rangeline Road
Infrastructure
Results
$4,403,797 est. value
Longwood, FL 32750

Last Updated 06/06/2022 10:41 AM
Project Title

Continuing Construction Services - Pre-Chlorinated Pipe Bursting with Site Restoration

Physical Address View project details and contacts
City, State (County) Altamonte Springs, FL   (Seminole County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,301,600
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General Contractors and/or Utility Contractors to provide all necessary labor, equipment, tools, materials, supplies and incidentals to perform pre-chlorinated pipe bursting and site restoration within the City on a continuing service contract basis. The work is planned to be completed over a five (5) year period (See below table), with multiple project areas assigned by multiple Work Order Assignments. The first project area has been identified as Spring Oaks East. The City’s desire is to complete the first Project Area before starting additional Planned Project Areas. The other Planned Project Areas have been identified with estimated quantities of work effort to aid Bidders in the preparation of the bid. These other Planned Project Areas, depending on size, may become standalone projects or smaller areas will be combined to generate a project area with a minimum of three thousand (3,000 LF) linear feet of pre-chlorinated water pipe bursting effort. A. The work for the Planned Project Areas includes, but shall not be limited to, prechlorinated water pipe bursting of four (4”) inch, six (6”) inch, eight (8”) inch, ten (10”) inch, and twelve (12”) inch asbestos concrete water main; replacing deficient valves; adding gate valves, adding fire hydrants; roadway base and patching work; miscellaneous concrete repairs including sidewalks, curb and gutter, irrigation system repairs and lawn restoration. All proposed restoration shall be limited to the affected construction limits, and field verified pre and post construction by the City and the awarded Contractor.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents