Similar Projects
Factory Powersports
New Construction
Conception
Saint George, UT 84770

Extra Space Storage
New Construction - 1,350 SF
Conception
Payson, UT 84651

Fortress Self-Storage
New Construction
Design
Tooele, UT 84074

Lakeview Business Park
New Construction
Design
$1,500,000,000 est. value
Tooele, UT 84074

Construction of Trenton Chlorination Building
New Construction
Bidding
Trenton, UT

AMXG Aircraft Facilitate Other Maintenance (FOM) for Hill AFB
Post-Bid
Ogden, UT

AMXG Aircraft Facilitate Other Maintenance (FOM) for Hill AFB
Post-Bid
Ogden, UT

Pre-Engineered Metal Building
Results
Saint George, UT 84770

Prefabricated Metal Shelters
Term Contract
Results
Salt Lake City, UT 84114

Costco Dry Depot Additon #594
Addition - 56,700 SF
Construction
$4,300,000 est. value
Salt Lake City, UT 84104

Harmons Distribution Warehouse
Renovation - 57,670 SF
Construction
West Valley City, UT 84119

D & D Commercial
New Construction
Pending Verification
Saint George, UT

Westfield Subdivision Commercial
New Construction - 10,500 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Logan, UT 84321

Las Americas Boat & RV Storage
New Construction - 652,134 SF
Conception
$10,000,000 CJ est. value
Eden, UT 84310

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Design
Park City, UT 84098

Last Updated 07/19/2021 09:42 AM
Project Title

Construction Manager/General Contractor for the Public Work Renovation and Vehicle Storage Facility

Physical Address View project details and contacts
City, State (County) Coalville, UT 84017   (Summit County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,720,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will include the remodeling of the approximately 2,500 S.F. existing Public Works Offices with an approximately 1,200 expansion, Construction of a new 10,000 S.F. Vehicle and Equipment Storage Building, Repair of the existing Salt Storage Building, and constructing an approximate 2,500 S.F. addition to the existing Salt Storage Building.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents