Similar Projects
Water Station Electrical Improvements - Motor Control Replacement - Station 2, 21 and 22
Alteration
Conception
$820,000 est. value
Schaumburg, IL

Water Station Electrical Improvements - ATS Replacement - Station 20 and 21
Alteration
Conception
$490,000 est. value
Schaumburg, IL

Lantz Arena Generator Replacement
Renovation
Sub-Bidding
$248,000 CJ est. value
Charleston, IL 61920

KCPA - Electrical Upgrades Division 01 - General Work
Renovation
Sub-Bidding
$200,000 CJ est. value
Urbana, IL 61801

Towable Aircraft Ground Power Unit
Alteration
Post-Bid
Chicago, IL

Guaranteed Energy Savings Contract
Alteration
Post-Bid
Cairo, IL

Standby Generator and MCC Replacement
Alteration
Results
Arlington Heights, IL

Generator Load Bank Maintenance
Term Contract
Results
Hines, IL 60141

Upgrade Parking Lots, Drainage, Lighting, and Landscaping South Suburban College - Illinois Capital Development Board
Infrastructure
Pending Verification
$231,245 CJ est. value
South Holland, IL 60473

KCPA - Electrical Upgrades Division 03 & Division 05
Renovation
Sub-Bidding
$250,000 CJ est. value
Urbana, IL 61801

Streetlight Maintenance, Repair, and Location of Underground Wiring
Term Contract
Post-Bid
Des Plaines, IL

Harper College - Building V Greenhouse Heat
Alteration
Results
Palatine, IL

Krannert Center for Performing Arts Electrical Upgrade Contract Divisions - 03,05
Renovation
Sub-Bidding
$300,000 CJ est. value
Urbana, IL 61801

Electric Substations - Springbrook Fixed Axis Solar Photovoltaic Systems
Alteration
Post-Bid
La Grange, Naperville, IL 60540

CPS Phillips MEP
Alteration
Results
Chicago, IL

Last Updated 06/07/2023 03:07 PM
Project Title

Bureau County Courthouse Boiler Replacement

Physical Address View project details and contacts
City, State (County) Princeton, IL 61356   (Bureau County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

WORK consists generally of boiler replacement at Bureau County Courthouse including replacement of existing boiler including pumps, piping, insulation, temperature controls, and electrical work. Bids will be received for completion of entire project under a single Mechanical Contract, which will include Mechanical, General, Electrical and other Miscellaneous Work. Substantial completion date for the project is Friday, September 29, 2023. Each bid shall be accompanied by a bid security consisting of a bid bond or certified check made payable to the Owner, in the amount of 5% of the bid sum. Performance and Payment bonds will be required. Commencement of the work on the project shall be subject to the discretion of the Bureau County Board. The Owner reserves the right to waive any irregularities and to accept any or reject all bids when in the opinion of the Owner, such action will serve the best interest of the Owner. The Owner anticipates a letter of intent to award the contract on Wednesday, June 14, 2023. Bids on all work on the contract shall be subject to the provisions of the "Illinois Prevailing Wage Act" (820 ILCS 130). Correspondence shall be directed to Keith Engineering Design Inc., 707 NE Jefferson Ave., Peoria, Illinois 61603, (309) 938-4005, Attention: Mr. Ryan Holmes. No bid shall be withdrawn for 60 days after opening of bids without consent of Owner.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents