Similar Projects
Mini Storage
New Construction
Design
Martinsburg, WV 25404

White Horse Pre-Engineered Metal Storage Building
New Construction - 2,376 SF
Results
$698,500 est. value
Springfield, WV

Distribution Warehouse - Harrison Regional Industrial Park
New Construction - 50,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Clarksburg, WV 26301

Duplaga Professional Center
New Construction - 12,000 SF
Conception
Wheeling, WV

Water Treatment Plants and Storage Facilities
New Construction
Design
Athens, WV

Ridgeview Elementary School Kitchen Addition, Canopies and Storage Buildings
Addition - 1,225 SF
Results
Less than $1,150,000 est. value
Crab Orchard, WV 25827

Park Place Commercial Center - Storage Facility
New Construction - 104,580 SF
Conception
$10,000,000 CJ est. value
South Charleston, WV

Boyd Cat Dyno Renovations
Renovation
Construction
Belle, WV 25015

Berkeley County Schools Warehouse Renovations
Renovation
Post-Bid
Martinsburg, WV

Rhino Self Storage
New Construction - 59,500 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Charleston, WV 25314

Sheetz Transfer Station
New Construction - 1,900 SF
Pending Verification
$2,000,000 est. value
Kearneysville, WV

Tabler Station Logistics Park - Phase I
New Construction - 730,800 SF
Post-Bid
Martinsburg, WV 25402

Panhandle Cleaning and Restoration
New Construction - 12,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Wheeling, WV 26003

Harvest Care Medical at Harrison Regional Industrial Park
New Construction - 50,000 SF
Conception
$8,000,000 to $9,000,000 est. value
Clarksburg, WV 26301

ABCA Warehouse Fire Prevention Renovations
Renovation
Bidding
Nitro, WV 25143

Reported 07/17/2021 12:00 AM
Project Title

48'x48'x18' Maintenance Building, Electrical, Boiler Work, Plumbing

Physical Address View project details and contacts
City, State (County) Wiley Ford, WV 26767   (Mineral County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

MATERIAL PACKAGE (All materials and products must be equal to specified or better.) Pre-engineered wood trusses (4/12 pitch, 4'O/C) 5.25"x5.25" Ridgidply 4 Ply Eave Posts (8' O/C) 5.25"x5.25" Ridgidply 4 Ply Gable Posts (8' O/C) 2"x8" Treated Southern Yellow Pine Skirt Boards (1 row) 2"x4" Wall Girts (24" O/C) and Roof Purlins (24" O/C) 2"x12" Top Girt Exterior with a 2x10 Top Girt Interior 1/4" Pactiv Fanfold Insulation on Roof White Grand-Rib #1 Steel Siding Evergreen Grand-Rib #1 Steel Roof One Concrete Pad per Post Hole DOORS & WINDOWS 2-3265 16'x16' C.H.I. Overhead doors with 3" full angle track and glass 2-36" Entry doors with panic hardware (owner will specify door swing) 12" OVERHAND ON ALL SIDES STEEL SOFFIT Complete installed package onsite TOTAL PRICE: Options/additions pricing 3/4" Performance Star Insulation on sidewalls add: 6" Textra Fine insulation in wall cavity add: 29 Gauge white metal ceiling liner add: R-38 cellulose ceiling add: Interior wall girts and liner panel add: 2-Chamberlain commercial O.H. door openers add: 5" 4000 psi concrete floor with wire add: 2" Hitz Halter insulation under slab and around slab perimeter and 1/2" Pex tubing and manifolds for radiant heat add: 60" concrete apron in front of building blended to surrounding grade add: Gutters and downspouts (green) add: Snow retention rail add: 2- 8’ poly grate drains installed in floor (to building perimeter add: 8’x8’ framed interior room with ¾” sheeting on ceiling (includes metal wall and ceiling liner) add: 4- 6” bollards with covers at OH door entrances to protect door corners add:

Details

1 Warehouse/Storage, 2,304 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment, Parking Control Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents