Similar Projects
Last Updated | 06/20/2023 07:36 PM |
Project Title | 2023 ESC Flooring Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Adrian, MI 49221 (Lenawee County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. The Work covered by this section of Specifications includes, but is not limited to, the following: B. Demolish and remove existing materials as shown on the plan and noted in the Description of Work. C. Cover holes and other hazardous openings with approved materials and barriers. D. Remove all demolition materials and debris from the construction site and dispose of in a legal manner. E. Protect adequately the construction site, adjoining property, and utility services as work proceeds through all stages. The Lenawee Intermediate School District will receive sealed bid proposals from qualified Flooring Contractors for the LISD ESC Flooring Replacement Project. All proposals shall include all labor, materials, and permits. Additional bond requirements are listed in the bid specifications. Questions and comments by Contractors for inclusion as Bidders shall be addressed to Todd Dailey, Dailey Engineering, Inc. by email at todddailey@me.com |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |