Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

Learning Resource Center Network Room Air Conditioner Replacement
Renovation
Sub-Bidding
$310,000 CJ est. value
Mattoon, IL 61938

Partial HVAC Replacement Wesclin Middle School
Renovation
Sub-Bidding
$300,000 CJ est. value
Trenton, IL 62293

Hail Damaged HVAC Equipment Replacement
Infrastructure
Post-Bid
Urbana, IL 61802

Central Community Center - RTU Replacement (Units 6, 8, 11)
Alteration
Post-Bid
Mount Prospect, IL 60056

Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Results
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Des Plaines HVAC Improvements
Results
Des Plaines, IL

Weatherization (IHWAP) Program
Term Contract
Post-Bid

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

HVAC Replacement and Toilet Room Remodeling
Renovation, Alteration
Post-Bid
Norridge, IL 60706

HVAC Replacement Arlington Heights Memorial Library
Results
Arlington Heights, IL

HVAC Roofing Plumbing Sewer Electrical
Infrastructure
Post-Bid
Cicero, IL

Replace Split System Condensing Unit at Pace Northwest Division
Results
Arlington Heights, IL

HVAC Cooling Systems
Alteration
Post-Bid
Riverdale, IL

J041--Repairs need to HVAC System(578)
Term Contract
Results
Hines, IL

Last Updated 02/16/2023 01:02 AM
Project Title

Boiler Replacement at Payson Elementary School

Physical Address View project details and contacts
City, State (County) Payson, IL 62360   (Adams County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $160,100 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed Bids will be received by the Payson CUSD #1,Payson, Adams County, Illinois for installation of the following: HEALTH LIFE SAFETY WORK: BOILER REPLACEMENT AT: PAYSON ELEMENTARY SCHOOL 404 W. State, Payson, IL 62360 Bids shall be accompanied by a Bid Bond in the amount of 5% of the TOTAL BASE BID. A certified check or bank draft, payable to the order of the Payson CUSD #1 equal to this amount will be an acceptable Bid Bond. Pursuant to Section 10-20.21 of the School Code, awards will be made to the lowest responsible bidder as reasonably determined by the Board of Education considering conformity with specifications, terms of delivery, quality and serviceability. In evaluating these factors, the Board will necessarily consider and compare (relative to the other bidders) the experience of the bidder on this type of project or similar projects, AND the performance history of the bidder regarding conformity with specifications, meeting terms of delivery and quality of work AND the performance history and ability of the bidder to complete the project on time, to service the product (including response time to service calls) and workmanship on the project. THE BOARD OF EDUCATION IS NOT OBLIGATED TO ACCEPT THE LOWEST DOLLAR BID AND RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS OR TO WAIVE ANY INFORMALITIES, IRREGULARITIES, TECHNICALITIES, OR DEFECTS IN ANY BID SHOULD THE BOARD DEEM IT IN THE BEST INTEREST OF THE Awards, if made, will be made within sixty (60) days following the opening of these bids. Labor Statutes, Prevailing Wage Rates - In the employment and use of labor, contractors will be required to conform to all Illinois statutory requirements regarding labor and to pay not less than the prevailing rate of wages for all classifications of labor as determined by the Illinois Department of Labor. Prevailing wages are subject to change. Rates are available at the office of the Adams County Clerk, 521 Vermont Street, Quincy, Illinois 62301. Certified payroll records shall comply with the requirement of 820 ILCS 130/5. Prospective bidders must comply with 30 Illinois Compiled Statutes 570 et seq. regarding preference to Illinois citizens or public works projects The bidder shall comply with the applicable provisions of the Illinois Human Rights Act specifically including but not limited to the requirement of 775 ILCS 5/2-105 that bidder shall have a written sexual harassment policy in place including at a minimum those requirements of such statutory provision. Said policy must be filed with Payson CUSD #1 prior to commencing work. The bidder shall comply with the requirement of 820 ILCS 265/15 that bidder shall have a written substance abuse prevention program in place including at a minimum those requirements of such statutory provision. Said program must be filed with the Payson CUSD #1 prior to commencing work. All construction work on this project must be completed on or before August 4, 2023. Total Base Bid 'A - Keck Heating - $121800 Total Base Bid 'B - Keck Heating - $38300

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents