Similar Projects
Runway 6 Approach Clearing
Infrastructure
Bidding
Roxboro, NC

Runway 36R EMAS Seam Sealant Replacement
Alteration
Bidding
Charlotte, NC

Runway 5R-23L Rehabilitation Project, Construction Phase 4
Post-Bid
Greensboro, NC 27409

Update Markings on Taxiway F
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC 28533

Runway 18C/36C Joint Sealant Replacement, Spall Repairs and Taxiway Shoulder Repair
Results
Charlotte, NC

Runway 5R-23L Repairs
Results
Less than $598,895 est. value
Raleigh, NC 27623

Koury Apron Rehabilitation
Infrastructure
Bidding
Greensboro, NC

Taxiways D and A1 Resurfacing
Post-Bid
Raleigh, NC

Taxiway Shoulder Pavement Rehabilitation Phase I
Results
Charlotte, NC 28202

Airport - Partial Parallel Taxiway and Apron Expansion
Post-Bid
$3,500,000 to $3,800,000 est. value
Jefferson, NC 28640

New Corporate Taxilane and Corporate Hangar Phase 1 Site Preparation
Results
Greenville, NC 27834

Install Runway 23R ILS Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Cherry Point, NC

Runway 10 Safety Area Improvements Project
Results
Statesville, NC 28677

Aircraft Parking Apron Rehabilitation
Infrastructure
Post-Bid
Manteo, NC

North Hangar Development
Results
NC

Last Updated 09/01/2021 02:59 PM
Project Title

Hangar Taxilane, Access Road, Parking, and Utilities

Physical Address View project details and contacts
City, State (County) Carthage, NC   (Moore County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project shall consist of furnishing all labor, materials, and equipment and performing all work required to satisfactorily complete the Schedule I: Hangar Taxilane, Access Road, Parking, and Utilities and Schedule II: 12-Unit T-Hangar and 5-Unit Box Hangar project. Items of work include general site work, storm drain pipe and structure installation, aggregate base course and bituminous paving, pavement marking, water and sewer utility improvements, light pole installation, skimmer basin, and hangar building construction for 12-Unit T-Hangar and 5-Unit Box Hangar with associated mechanical, electrical, and plumbing work.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents