Similar Projects
Reese Road Culvert Replacement and Haines Road Culvert Replacement
Post-Bid
Buffalo, PA

Hope Road Retaining Wall Project
Post-Bid
Prosperity, PA 15329

2018 Union Township Drainage Improvements Project
Results
Finleyville, PA

Culvert Replacement Project
Results
Hickory, PA 15340

Canonsburg Erosion Repair
Post-Bid
Canonsburg, PA 15317

Robena Culvert Replacement Project
Results
Monongahela, PA 15063

South Fayette Township School District Landslide Remediation
Post-Bid
McDonald, PA 15057

College Street Culvert Rehabilitation
Results
Less than $80,000 est. value
Canonsburg, PA

Carter Lane and Hoop Lane Dirt, Gravel Low Volume Road Maintenance Project
Post-Bid
Hickory, PA 15340

2018 Second Street Drainage Improvements Project
Results
West Brownsville, PA

2019 Deer Trail Slide Repair Project
Post-Bid
Claysville, PA 15377

2018 Arden Slide Repair Project
Results
Houston, PA

2019 Quaker Ridge Road Slide Repair Project
Post-Bid
Claysville, PA 15323

2019 Slide Repairs
Results
$2,500,000 to $4,999,999 est. value

Reinforced Concrete Pipe
Post-Bid
McDonald, PA

Reported 04/02/2019 12:00 AM
Project Title

2019 Detention Pond Rehabilitation

Physical Address View project details and contacts
City, State (County) McMurray, PA   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Rehabilitation of five existing stormwater detention ponds: Colony Manor Phase 3 (North Pond); Colony Manor Phase 3 (South Pond); Hidden Valley Manor Phase 1; Old Trail Phases 6&7; and Snowberry Woods. Work at each pond may include trimming and disposal of existing vegetation; removal of accumulated sediment; fine grading of the pond interior; re-establishment of low flow channels; outlet structure replacement at one pond; erosion & sedimentation controls; restoration of all disturbed areas; and other items incidental to the project.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents