Similar Projects
Perforated Metal, Eastern Ci Window
Post-Bid

Perforated Metal, Eastern Ci Window
Post-Bid

Battle Command Training Capability - Equipment Support (BCTC-ES) Competition
Results
$1,000,000 to $100,000,000 est. value

Battle Command Training Capability - Equipment Support (BCTC-ES) Competition
Results
$1,000,000 to $100,000,000 est. value

120 PTO HP Tractor
Term Contract
Post-Bid
Fayetteville, NC

Walking Floor Trailers
Results
Kenansville, NC 28349

Steel Transmission Poles and Miscellaneous Materials
Alteration
Post-Bid
Concord, NC

Motor Protection And Power Monitor Upgrades
Results
Less than $320,863 est. value
Fayetteville, NC

Ultraviolet Disinfecting Unit
Alteration
Post-Bid
$10,000 to $50,000 est. value

New Bern High School Doors Replacement Project
Alteration
Results
New Bern, NC 28562

7310--Food Service Equipment
Term Contract
Post-Bid
Asheville, NC 28805

Roll-Up Door Inspection and Maintenance Services
Term Contract
Results
Raleigh, NC

Reported 02/25/2022 12:45 PM
Project Title

Accessible Lift Replacement

Physical Address View project details and contacts
City, State (County) Hillsborough, NC 27278   (Orange County)
Category(s) Single Trades
Sub-Category(s) Equipment, Finishes/Interior, Windows/Doors
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide a labor and materials to replace the existing accessible wheel chair lift from the 1st floor to the 2nd floor of building. The scope of work includes repairs to the interior walls and existing doors in order for this lift to operate per code requirements. This scope shall also include any and all other trades necessary for this to be a turnkey project. 2nd floor Entrance door to be replaced. Door to accommodate card reader for access with lock override. Door lock system shall be a lever handle with Corbin Russwin L4 blank key and core. Cracks in masonry on the side to be repaired. Shaded in blue. Clean wall tiles. Clean inside walls of shaft area and paint with Sherwin Williams Pure White SW7005. Replace existing light fixture with new LED light with cool lights for higher cooler temperature. Alternate 1: Provide (2) Electric door hardware kits for both the 1st and 2nd floor doors to allow for card readers to be installed. Alternate 2: Provide pricing to remove the existing wall tiles, repair walls and paint to match the other walls inside the lift shaft.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Interior Wall Paneling.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents