Similar Projects
2023 Chip Seal
Infrastructure
Bidding
$480,000 CJ est. value
Vermillion, SD 57069

2023 Chip Seal
Infrastructure
Bidding
$480,000 CJ est. value
Vermillion, SD 57069

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Wellness Center Expansion
Addition, Demolition, Renovation, Infrastructure - 48,064 SF
Results
$4,134,735 CJ est. value
Vermillion, SD 57069

Bond New Elementary School - Vermillion School District 13-1
Demolition, New Construction, Renovation, Infrastructure
Construction
$26,000,000 CJ est. value
Vermillion, SD 57069

Clay County Jail - Clay County
New Construction, Infrastructure
Pending Verification
$39,000,000 CJ est. value
Vermillion, SD 57069

Clay County Jail - Clay County
New Construction, Infrastructure
Pending Verification
$39,000,000 CJ est. value
Vermillion, SD 57069

Reinforced Concrete Culverts
Infrastructure, Alteration
Post-Bid
SD

Wellness Center Expansion Bid Package #1B
Addition, Demolition, Renovation, Infrastructure
Results
$6,075,000 CJ est. value
Vermillion, SD 57069

Les Schwab Tire Center
New Construction, Infrastructure - 10,880 SF
Pending Verification
$2,500,000 CJ est. value
Vermillion, SD 57069

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Wellness Center Expansion Bid Package #2
Addition, Demolition, Infrastructure
Results
$13,797,395 CJ est. value
Vermillion, SD 57069

Prentis Park Baseball Outfield Renovation
Infrastructure
Post-Bid
$80,000 CJ est. value
Vermillion, SD 57069

Last Updated 05/12/2023 05:02 PM
Project Title

Landfill Leachate Pond 2 Construction

Physical Address View project details and contacts
City, State (County) Vermillion, SD 57069   (Clay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,189,572 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The materials and services required are as follows: Vermillion Landfill Leachate Pond 2 Construction The project constist of construction of new Leachate Pond 2, leachate discharge vault, and other miscellaneous items as indicated on the Construction Drawings. Work for this shall consist of, but not be limited to, furnishing all supervision, labor, tools, equipment, transportation, storage facilities, services, and supplies required to complete the following: Mobilization, mass soil excavation and embankment fill, subgrade preparation, installation of liner system, leak detection sump, leachate forcemain piping, leachate discharge vault, construction of access road and fence, erosion control and restoration, and any other work detailed in the project drawings and project manual. Questions regarding the bid documents may be directed to: Jacob Hedman, PE - Burns & McDonnell Phone: 605-305-4163 Email: jphedman@burnsmcd.com Luke Rodig, PE - Burns & McDonnell Phone: 605-610-1793 Email: larodig@burnsmcd.com Bid security is required according to state law and the bid specifications. Bidders on this work will be required to comply with the Presidents Executive Orders Nos. 11246 as amended, 11518, and 11635 as amended . The requirements for bidders and contractors under these orders are explained in the specifications. Bidders on this work will be required to comply with Title 4o CFR 33 and Executive order 12138. The requirements for bidders and contractors under this regulation which concerns the utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Womens Business Enterprises (WBE) are explained in the specifications. The DBE/MBE and WBE goals for participation in this contract in terms of percentage of contract value are as follows: DBE/MBE 1.o percent; WBE 4.o percent. Davis Bacon and Related Acts wages apply to this project. All provisions relative to those acts must be met. Bidders on this work will be require to comply with the American Iron and Steel provisions. All provisions must be met. Bidders on this work will be required to assure compliance with the requirements of Public Law 115-232, Section 889, Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. The City of Vermillion reserves the right to reject any or all bids and to waive any irregularities therein.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents