Similar Projects
Last Updated | 04/26/2023 11:31 PM |
Project Title | 3rd Avenue Utility Extension |
Physical Address | View project details and contacts |
City, State (County) | Isanti, MN 55040 (Isanti County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bituminous Patch (Trail) 330 SY Bituminous Patch (Street) 700 SY 6 Concrete Pad 350 SY 2.5 Trenchless Forcemain 1,010 LF 8 Sanitary Sewer 1,060 LF Duplex Grinder Station 1 LS Sanitary Sewer Manhole 43 LF 6- 12 Watermain (Open Cut) 335 LF 12 Watermain (Trenchless) 1,920 LF 6- 8 Gate Valve and Box 10 EA Hydrant 5 EA Watermain Fittings 2,480 LB Hydraulic Bonded Fiber Matrix 3,330 LB Loam Topsoil Borrow (LV) 256 CY |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |